Full Cost Report — Per BMP

Project: Example Problem # 3   Date: 10/16/2026
Discount Rate: 3.3%   Project Duration: 30 years

Section 1 — Cost Components

catchment 1 — Retention

Component NameConst. Low ($)Const. High ($) Service Life (yr)O&M % LowO&M % High Annual O&M Low ($)Annual O&M High ($) Repl. Low (current $)Repl. High (current $)# Replacements Repl. at Time of Replacement Low ($)Repl. at Time of Replacement High ($) PV Repl. Low ($)PV Repl. High ($) PV O&M Low ($)PV O&M High ($)
Retention $100,000 $150,000 20 1.0000 6.0000 $1,000 $9,000 $100,000 $150,000 1 $163,862 $245,792 $85,599 $128,399 $18,862 $169,755
Outlet Structure, Fixed $10,000 $15,000 60 0.0300 0.4000 $3 $60 $10,000 $15,000 0 $0 $0 $0 $0 $57 $1,132
TOTALS $110,000$165,000 $1,003$9,060 $85,599$128,399 $18,918$170,887

Replacement costs. A replacement cost is entered as the current cost (today's dollars, a present value); a blank replacement cost uses the construction cost. The cost at the time of each replacement (future value) is estimated with the inflation rate (2.5%): FV = Replacement Cost × (1 + inflation)k × Life, for replacements k = 1, 2, … that fall before the end of the 30-year analysis period (a component whose life is equal to or longer than the period is not replaced). Each future value is discounted to today with the discount rate (3.3%): PV = FV / (1 + discount)k × Life. PV of Replacement is the sum of those present values.

Section 2 — Routine Maintenance Costs

catchment 1 — Retention

DescriptionUnitQuantity $/Unit Low$/Unit High Annual Low ($)Annual High ($) PV Low ($)PV High ($)
Mowing / Vegetation Control / Litter Removal each 2.00 $1,850.00 $1,850.00 $3,700 $3,700 $69,788 $69,788
TOTALS $3,700$3,700 $69,788$69,788