Summary Treatment Report: Specified Removal Efficiency

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 Highway Section 206 Multiple BMP 1: Retention 2: Wet Detention Routed to Outlet

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 6.00 4.79 9.58
System Post-Condition (with BMPs) 5.00 5.26 12.63
Post-Condition (no BMP) 5.00 13.90 33.37
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:
Specified (for Specified Removal Efficiency) TN = 70.00%; TP = 80.00%
Provided TN = 76.08%; TP = 88.59%

% Specified Removal:
Is specified removal for total nitrogen removal met?
Yes
Is specified removal for total phosphorus removal met?
Yes
Results are compared against the analysis type targets. Percentages are shown to two decimals.
No Pre/Post Analysis
Analysis Type: Specified Removal Efficiency
There are no pre/post targets for this analysis type.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load7.16 kg/yr
Total N post load21.43 kg/yr
Target N load reduction70.00 %
Target N discharge load6.43 kg/yr
Percent N load reduction76.08 %
Provided N discharge load5.13 kg/yr (11.30 lb/yr)
Provided N load removed (surface)16.30 kg/yr (35.95 lb/yr)
Phosphorus (P)
Total P pre load0.124 kg/yr
Total P post load2.966 kg/yr
Target P load reduction80.00 %
Target P discharge load0.593 kg/yr
Percent P load reduction88.59 %
Provided P discharge load0.338 kg/yr (0.746 lb/yr)
Provided P load removed (surface)2.627 kg/yr (5.793 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.