Summary Treatment Report: Impaired Water

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 Commercial site Filtration Routed to Outlet

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 3.00 1.05 4.21
System Post-Condition (with BMPs) 3.00 2.33 9.30
Post-Condition (no BMP) 3.00 8.05 32.18
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:
Specified (for Impaired Water) TN = 80.00%; TP = 80.00%
Provided TN = 53.33%; TP = 67.55%

% Specified Removal:
Is specified removal for total nitrogen removal met?
No
Is specified removal for total phosphorus removal met?
No
Results are compared against the analysis type targets. Percentages are shown to two decimals.
Pre vs. Post Removals
Pre/Post TN = 94.07%; TP = 98.37%
Provided TN = 53.33%; TP = 67.55%

% Removal:
Is removal (pre<=post) for total nitrogen removal met?
No
Is removal (pre<=post) for total phosphorus removal met?
No
Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.
Maximum Removals
Maximum TN = 94.07%; TP = 98.37%
Provided TN = 53.33%; TP = 67.55%

% Maximum Removal:
Is maximum removal for total nitrogen removal met?
No
Is maximum removal for total phosphorus removal met?
No
The maximum requirement is the greater of the Specified and Pre/Post removals. Percentages are shown to two decimals.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load1.41 kg/yr
Total N post load23.81 kg/yr
Percent N load reduction53.33 %
Provided N discharge load11.11 kg/yr (24.50 lb/yr)
Provided N load removed (surface)12.70 kg/yr (28.00 lb/yr)
Phosphorus (P)
Total P pre load0.056 kg/yr
Total P post load3.423 kg/yr
Percent P load reduction67.55 %
Provided P discharge load1.111 kg/yr (2.449 lb/yr)
Provided P load removed (surface)2.312 kg/yr (5.098 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.