Permeable Pavement Design Values

Pavement Surface Area (acres)0.50
Total Storage of Pavement (ac-ft)0.17
Watershed Area (acres)2.00
Treatment Depth (in)1.01
Time to Recover Design Volume (hr)72.00

Treatment Depth (in) = Total Storage of Pavement (ac-ft) / Watershed Area (ac) x 12. The whole catchment area is used, pavement included. Permeable pavement is always calculated as a retention BMP.

Pavement Layers

Pavement TypeSustainable Void (%)Thickness (in)Storage (in over pavement)Storage (ac-ft)
Concrete Permeable Pavement25.006.001.5000.063
#57 rock(non-calcareous)21.0012.002.5200.105
Total4.0200.168

Watershed Characteristics

Watershed Area (acres)2.00
Contributing Area to BMP (ac)1.50
Watershed Non-DCIA Curve Number (0-100)80
Watershed DCIA Percent (%)70.00
Rainfall ZoneFlorida Zone 3
Rainfall (in)54.00

Surface Water Discharge

Provided Nitrogen Treatment Efficiency (%)71.2
Provided Phosphorus Treatment Efficiency (%)71.2


Groundwater Discharge (Stand-Alone)

Average Annual Recharge (MG/yr)0.00
TN Mass Load (kg/yr)11.30
TN Concentration (mg/L)0.00
TP Mass Load (kg/yr)1.62
TP Concentration (mg/L)0.00



Surface Discharge Load Diagram for Permeable Pavement (stand-alone)

Runoff input is only from this catchment, no routing is performed here

Load
N: 15.87 kg/yr
P: 2.28 kg/yr
Q: 5.36 ac-ft/yr
→
Treatment
N: 71 %
P: 71 %
→
Surface Discharge
N: 4.57 kg/yr
P: 0.66 kg/yr
Q: 1.54 ac-ft/yr
↓
Mass Reduction
N: 11.30 kg/yr
P: 1.62 kg/yr