AHVI Section 9 Compliance Report

Nutrient load reduction calculations presented per Chapter 62-330, F.A.C., ERP Applicant's Handbook Volume I (effective June 28, 2024), Sections 8.3, 9.1–9.5 and Appendices M, N, O.
ProjectDetention in series 2020 TAC manual page 194
Project fileDetention Multiple catchments 2020 Manual pages 190 196.bmpt
Program used AHVI 9.2.1BMPFast version: 2026-10-16
Analysis typeAll sites non-exempted → AHVI 8.3.2
Report date10/16/2026

Method Statement AHVI 9.2, 9.2.1, 9.2.2

AHVI Section 9.2 accepts the concentration-based loading procedure of Sections 9.2.1 and 9.2.2, and permits alternative calculations or modeling that provide an equivalent or greater degree of supporting information and reliability. BMPFast implements the Section 9.2.1 / 9.2.2 procedure directly:

  1. Meteorological zone (Appendix M) and mean annual rainfall (Section 9.4) are project inputs.
  2. Each catchment is characterized by land use, area, non-DCIA curve number and percent DCIA for pre- and post-development (Section 9.2.1 b, e; Table 9.1).
  3. The mean annual runoff coefficient (ROC) is read from the Appendix N table for the project's zone as a function of CN and DCIA, with linear interpolation between tabulated values (Section 9.2.1 c). BMPFast's embedded ROC tables are the Appendix N tables.
  4. Annual runoff volume is Equation 9-1: Volume (ac-ft/yr) = Area (ac) × Rainfall (in/yr) × ROC / 12.
  5. Event mean concentrations default to Table 9.2 statewide values for the selected land use; regional/Volume II values or study-based values may be entered by the user (Section 9.2.2 a, b). Composite (area- and runoff-weighted) EMCs are computed where a catchment contains several land uses.
  6. Average annual mass loading is Equation 9-2: Load = Volume × EMC with unit conversion. BMPFast carries loads in kg/yr (1.233 kg per mg/L·ac-ft); the lb/yr equivalent (2.7189 lb per mg/L·ac-ft, i.e. Equation 9-2 as printed in AHVI) is shown alongside.
  7. The required treatment efficiency is the greater of the Section 8.3 percentage and the Equation 9-3 pre/post percentage; Equation 9-4 gives the maximum allowable post-development discharge load (Section 9.3).
  8. BMP efficiencies follow Appendix O: dry retention (and swale, rain garden, green roof, tree well, pervious pavement, exfiltration) from the Appendix O mean-annual removal tables by zone / CN / DCIA / retention depth; wet detention from the Appendix O residence-time equations; treatment trains per Section 9.5.1.

The Appendix N and Appendix O tables and equations are those of Evaluation of Current Stormwater Design Criteria within the State of Florida (Harper & Baker, FDEP, 2007), which is also the technical basis of BMPTRAINS / BMPFast.

1. Project Inputs AHVI 9.2.1(a), 9.4, App. M

Meteorological zone (Appendix M)Zone 4  (Florida Zone 4)
Mean annual rainfall (Section 9.4 / Appendix M isopleths)52.0 in/yr
Number of catchments3
Groundwater discharge analysisNo

The mean annual rainfall entered by the user should be the NCEI average annual value for the site from the Appendix M isopleths (AHVI 9.4). Users may open the rainfall / zone maps from the BMPFast main form.

2. Predevelopment and Post-development Hydrology AHVI 9.2.1, Table 9.1, App. N, Eq. 9-1

Equation 9-1:   Annual Runoff Volume (ac-ft/yr) = Area (ac) × Mean Annual Rainfall (in/yr) × ROC × (1/12)

ROC = mean annual runoff coefficient from the Appendix N table for Zone 4 at the catchment's non-DCIA CN and % DCIA (linear interpolation). For post-development, the wet-pond surface area (if any) is excluded from the contributing area; rainfall on the pond is accounted for inside the wet detention calculation.

CatchmentConditionLand use categoryArea (ac)Non-DCIA CNDCIA (%)ROC (App. N)Rainfall (in)Runoff (ac-ft/yr)Runoff (in/yr)
1 – upstream onePreAgricultural - Citrus20.75680.00.06552.05.863.4
PostUser Defined Values19.96
(20.75 total − 0.79 pond)
7617.90.23252.020.0812.1
Composite post-development land-use rows entered in the composite CN / EMC worksheet (area-weighted to the catchment CN and runoff-weighted to the catchment EMC):
  row 18.396817.90.200
  row 212.368017.90.254
2 – Catchment 2PreAgricultural - Citrus25.13680.00.06552.07.103.4
PostUser Defined Values23.58
(25.13 total − 1.55 pond)
7617.80.23152.023.6412.0
Composite post-development land-use rows entered in the composite CN / EMC worksheet (area-weighted to the catchment CN and runoff-weighted to the catchment EMC):
  row 16.486817.80.200
  row 214.918417.80.287
  row 33.748417.80.287
3 – Catchment 0PreAgricultural - Citrus37.41680.00.06552.010.573.4
PostUser Defined Values35.71
(37.41 total − 1.70 pond)
8419.00.29552.045.6715.3
TotalPre83.2923.54
TotalPost79.2589.39

3. Predevelopment and Post-development Nutrient Loading AHVI 9.2.2, Table 9.2, Eq. 9-2

Equation 9-2:   Load (lb/yr) = Runoff Volume (ac-ft/yr) × EMC (mg/L) × 43,560 ft³/ac-ft × 7.48 gal/ft³ × 3.785 L/gal × (1 lb / 453,592 mg)  =  Volume × EMC × 2.7189
BMPFast:   Load (kg/yr) = Runoff Volume (ac-ft/yr) × EMC (mg/L) × 1.233    (2.7189 lb × 0.4536 kg/lb)
CatchmentConditionLand use / EMC sourceRunoff (ac-ft/yr)TN EMC (mg/L)TP EMC (mg/L)TN load (kg/yr)TN load (lb/yr)TP load (kg/yr)TP load (lb/yr)
1 – upstream onePreAgricultural - Citrus
Table 9.2 – Citrus
5.862.1100.18015.2633.641.3022.869
PostUser Defined Values
User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application)
20.081.8160.45344.9599.1111.21424.722
2 – Catchment 2PreAgricultural - Citrus
Table 9.2 – Citrus
7.102.1100.18018.4840.741.5763.475
PostUser Defined Values
User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application)
23.641.7150.40750.00110.2311.86626.160
3 – Catchment 0PreAgricultural - Citrus
Table 9.2 – Citrus
10.572.1100.18027.5160.642.3475.173
PostUser Defined Values
User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application)
45.671.8160.453102.26225.4425.50856.235
TotalPre61.24135.015.22411.518
TotalPost (before treatment)197.21434.7748.587107.116

Post-development loads are the loads before treatment as required by AHVI 8.3.1. Where a catchment contains more than one land use the EMC shown is the runoff-weighted composite EMC (Section 9.2.2 a; see the composite rows in Section 2).

4. Required Treatment Efficiency AHVI 9.3, Eq. 9-3, Eq. 9-4; 8.3

Performance standard applied: AHVI 8.3.2
Greater of (a) 55% TN and 80% TP reduction of the post-development average annual load, or (b) post-development load not exceeding the predevelopment load.
Equation 9-3:   Required % reduction (pre/post) = [1 − (Predevelopment load / Post-development load)] × 100
Equation 9-4:   Maximum post-development discharge load = (1 − Load Reduction) × Post-development load
QuantityTotal NitrogenTotal PhosphorusBasis
Predevelopment load (kg/yr  |  lb/yr)61.24 | 135.015.224 | 11.518Section 3 totals
Post-development load before treatment (kg/yr  |  lb/yr)197.21 | 434.7748.587 | 107.116Section 3 totals
Reduction for post = pre (%)68.9589.25Eq. 9-3
Section 8.3 percentage standard (%)55.0080.00AHVI 8.3.2
Governing required reduction (%)68.9589.25Greater of Section 8.3 % and Eq. 9-3 (AHVI 9.1 step 4, 9.3)
Maximum allowable post-development discharge load (kg/yr  |  lb/yr)61.24 | 135.015.224 | 11.518Eq. 9-4

5. Best Management Practices and Treatment Efficiencies AHVI 9.5, App. O

CatchmentBMPAppendix O basisKey design valuesTN eff. (%)TP eff. (%)
1 – upstream oneWet DetentionAppendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%).Average annual residence time = 18.2 days
Hydraulic capture efficiency = 60.0 %
Non-DCIA CN = 76, DCIA = 17.9 %
35.360.4
2 – Catchment 2Wet DetentionAppendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%).Average annual residence time = 10.4 days
Hydraulic capture efficiency = 65.0 %
Non-DCIA CN = 76, DCIA = 17.8 %
30.856.2
3 – Catchment 0Wet DetentionAppendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%).Average annual residence time = 10.2 days
Hydraulic capture efficiency = 60.0 %
Non-DCIA CN = 84, DCIA = 19.0 %
27.650.5

Efficiencies are the stand-alone mean annual mass removal efficiencies of each BMP for its own catchment. Efficiencies actually credited in the routed system are in Section 6.

5.1 BMP design inputs (as entered)

Catchment 1 – upstream one – Wet Detention

Wet Detention Input Variables

Permanent Pool Volume (ac-ft)1.00
Permanent Pool Volume for 31 days residence (ac-ft)1.71
Average Residence Time (days)18.18
Has Littoral ZoneTrue
Wetland Efficiency Credit (%)0.00

Warning (littoral zone credit used more than once): The wet pond in upstream one (this one) is routed in series with the wet pond in Catchment 2, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the series removal in the Summary and Complete reports is too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one. Keep it on the pond whose littoral zone is built and maintained.

Catchment 2 – Catchment 2 – Wet Detention

Wet Detention Input Variables

Permanent Pool Volume (ac-ft)1.25
Permanent Pool Volume for 31 days residence (ac-ft)3.71
Average Residence Time (days)10.44
Has Littoral ZoneTrue
Wetland Efficiency Credit (%)0.00

Warning (littoral zone credit used more than once): The wet pond in Catchment 2 (this one) is routed in series with the wet pond in upstream one, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the series removal in the Summary and Complete reports is too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one. Keep it on the pond whose littoral zone is built and maintained.

Catchment 3 – Catchment 0 – Wet Detention

Wet Detention Input Variables

Permanent Pool Volume (ac-ft)2.50
Permanent Pool Volume for 31 days residence (ac-ft)7.59
Average Residence Time (days)10.21
Has Littoral ZoneFalse
Wetland Efficiency Credit (%)0.00

6. Treatment Train Routing AHVI 9.5.1, Eq. 9-5

Equation 9-5:   Overall efficiency = 1 − [(1 − Eff1) × (1 − Eff2) × … × (1 − Effn)]    (independent BMPs in series)

BMPFast routes the annual runoff volume (Q) and TN / TP mass through the catchment network from upstream to downstream. At each node the upstream discharge and the node's own catchment load are summed and passed through the node's BMP, so the mass available to each downstream BMP is the reduced mass leaving the upstream BMP – this is Equation 9-5 expressed in mass rather than fraction form, and it also handles junctions where several inputs meet. Where consecutive nodes are all dry retention, all wet detention, or untreated areas draining to a single retention or detention system, the group is calculated as one system (a strand) using the combined retention depth or combined residence time, because in those cases the upstream unit changes the volume or residence time available to the downstream unit – the "identifiable causal relationship" for which Section 9.5.1 directs the designer to use a methodology other than the independent-efficiency form of Equation 9-5.

Q in ac-ft/yr; N and P in kg/yr; nodes listed in calculation (upstream to downstream) order.

Q in ac-ft/yr; N and P in kg/yr. Nodes are listed in calculation (upstream to downstream) order. Nodes in series calculated as a single system (a strand) are shown as one row, e.g. [1->8].

Node #Node Input(s) #Upstream InputsCatchment InputsRemoval %Output(s)
QNPQNPN%P%QNP
[1->2->3]
Strand: All Catchments are Detention in Series
—0.000.000.0089.39197.2148.5942.366.789.39113.7316.17
Outlet389.39113.7316.17—————89.39113.7316.17

Warning (littoral zones in series): the wet ponds in upstream one and Catchment 2 are routed in series, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the removals in this report are too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one (keep it on the pond whose littoral zone is built and maintained).

Strands calculated as a single system

7. Post-development Discharge and Compliance AHVI 8.3, 9.1 step 5

QuantityTotal NitrogenTotal Phosphorus
Post-development load before treatment (kg/yr | lb/yr)197.21 | 434.7748.587 | 107.116
Post-development discharge load after treatment, at outlet (kg/yr | lb/yr)113.73 | 250.7316.166 | 35.641
Load removed (kg/yr | lb/yr)83.48 | 184.0432.421 | 71.476
Provided system treatment efficiency (%)42.3366.73
Required reduction (%) – Section 468.9589.25
Maximum allowable discharge load, Eq. 9-4 (kg/yr | lb/yr)61.24 | 135.015.224 | 11.518
Predevelopment load (kg/yr | lb/yr)61.24 | 135.015.224 | 11.518
Compliance with AHVI 8.3.2
Section 8.3 percentage standard met – TN (55%)?No
Section 8.3 percentage standard met – TP (80%)?No
Post-development discharge ≤ predevelopment load – TN?No
Post-development discharge ≤ predevelopment load – TP?No
Governing requirement met – TN?No
Governing requirement met – TP?No

AHVI 9.5: where the maximum load is not met, modify the selected BMP or incorporate additional BMPs (or compensating treatment per 9.7) to achieve the required TN / TP load reductions.

Annual runoff volume balance

Predevelopment runoff volume (ac-ft/yr)23.54
Post-development runoff volume from catchments (ac-ft/yr)93.91
Post-development surface discharge at outlet (ac-ft/yr)0.00

8. Method Basis and References

Reviewer note: the runoff coefficient (Section 2), EMC (Section 3), Equation 9-1 / 9-2 loads, Equation 9-3 / 9-4 required treatment (Section 4) and BMP efficiencies (Section 5) can each be checked by hand against Appendices N and O and Tables 9.1 / 9.2 using the inputs printed in this report; the routing (Section 6) is the mass-form application of Equation 9-5.