| Project | Detention in series 2020 TAC manual page 194 |
| Project file | Detention Multiple catchments 2020 Manual pages 190 196.bmpt |
| Program used AHVI 9.2.1 | BMPFast version: 2026-10-16 |
| Analysis type | All sites non-exempted → AHVI 8.3.2 |
| Report date | 10/16/2026 |
AHVI Section 9.2 accepts the concentration-based loading procedure of Sections 9.2.1 and 9.2.2, and permits alternative calculations or modeling that provide an equivalent or greater degree of supporting information and reliability. BMPFast implements the Section 9.2.1 / 9.2.2 procedure directly:
The Appendix N and Appendix O tables and equations are those of Evaluation of Current Stormwater Design Criteria within the State of Florida (Harper & Baker, FDEP, 2007), which is also the technical basis of BMPTRAINS / BMPFast.
| Meteorological zone (Appendix M) | Zone 4 (Florida Zone 4) |
| Mean annual rainfall (Section 9.4 / Appendix M isopleths) | 52.0 in/yr |
| Number of catchments | 3 |
| Groundwater discharge analysis | No |
The mean annual rainfall entered by the user should be the NCEI average annual value for the site from the Appendix M isopleths (AHVI 9.4). Users may open the rainfall / zone maps from the BMPFast main form.
ROC = mean annual runoff coefficient from the Appendix N table for Zone 4 at the catchment's non-DCIA CN and % DCIA (linear interpolation). For post-development, the wet-pond surface area (if any) is excluded from the contributing area; rainfall on the pond is accounted for inside the wet detention calculation.
| Catchment | Condition | Land use category | Area (ac) | Non-DCIA CN | DCIA (%) | ROC (App. N) | Rainfall (in) | Runoff (ac-ft/yr) | Runoff (in/yr) |
|---|---|---|---|---|---|---|---|---|---|
| 1 – upstream one | Pre | Agricultural - Citrus | 20.75 | 68 | 0.0 | 0.065 | 52.0 | 5.86 | 3.4 |
| Post | User Defined Values | 19.96 (20.75 total − 0.79 pond) | 76 | 17.9 | 0.232 | 52.0 | 20.08 | 12.1 | |
| Composite post-development land-use rows entered in the composite CN / EMC worksheet (area-weighted to the catchment CN and runoff-weighted to the catchment EMC): | |||||||||
| row 1 | 8.39 | 68 | 17.9 | 0.200 | |||||
| row 2 | 12.36 | 80 | 17.9 | 0.254 | |||||
| 2 – Catchment 2 | Pre | Agricultural - Citrus | 25.13 | 68 | 0.0 | 0.065 | 52.0 | 7.10 | 3.4 |
| Post | User Defined Values | 23.58 (25.13 total − 1.55 pond) | 76 | 17.8 | 0.231 | 52.0 | 23.64 | 12.0 | |
| Composite post-development land-use rows entered in the composite CN / EMC worksheet (area-weighted to the catchment CN and runoff-weighted to the catchment EMC): | |||||||||
| row 1 | 6.48 | 68 | 17.8 | 0.200 | |||||
| row 2 | 14.91 | 84 | 17.8 | 0.287 | |||||
| row 3 | 3.74 | 84 | 17.8 | 0.287 | |||||
| 3 – Catchment 0 | Pre | Agricultural - Citrus | 37.41 | 68 | 0.0 | 0.065 | 52.0 | 10.57 | 3.4 |
| Post | User Defined Values | 35.71 (37.41 total − 1.70 pond) | 84 | 19.0 | 0.295 | 52.0 | 45.67 | 15.3 | |
| Total | Pre | 83.29 | 23.54 | ||||||
| Total | Post | 79.25 | 89.39 | ||||||
| Catchment | Condition | Land use / EMC source | Runoff (ac-ft/yr) | TN EMC (mg/L) | TP EMC (mg/L) | TN load (kg/yr) | TN load (lb/yr) | TP load (kg/yr) | TP load (lb/yr) |
|---|---|---|---|---|---|---|---|---|---|
| 1 – upstream one | Pre | Agricultural - Citrus Table 9.2 – Citrus | 5.86 | 2.110 | 0.180 | 15.26 | 33.64 | 1.302 | 2.869 |
| Post | User Defined Values User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application) | 20.08 | 1.816 | 0.453 | 44.95 | 99.11 | 11.214 | 24.722 | |
| 2 – Catchment 2 | Pre | Agricultural - Citrus Table 9.2 – Citrus | 7.10 | 2.110 | 0.180 | 18.48 | 40.74 | 1.576 | 3.475 |
| Post | User Defined Values User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application) | 23.64 | 1.715 | 0.407 | 50.00 | 110.23 | 11.866 | 26.160 | |
| 3 – Catchment 0 | Pre | Agricultural - Citrus Table 9.2 – Citrus | 10.57 | 2.110 | 0.180 | 27.51 | 60.64 | 2.347 | 5.173 |
| Post | User Defined Values User-defined EMC (Section 9.2.2 b – regional / study values; documentation to accompany application) | 45.67 | 1.816 | 0.453 | 102.26 | 225.44 | 25.508 | 56.235 | |
| Total | Pre | 61.24 | 135.01 | 5.224 | 11.518 | ||||
| Total | Post (before treatment) | 197.21 | 434.77 | 48.587 | 107.116 |
Post-development loads are the loads before treatment as required by AHVI 8.3.1. Where a catchment contains more than one land use the EMC shown is the runoff-weighted composite EMC (Section 9.2.2 a; see the composite rows in Section 2).
| Quantity | Total Nitrogen | Total Phosphorus | Basis |
|---|---|---|---|
| Predevelopment load (kg/yr | lb/yr) | 61.24 | 135.01 | 5.224 | 11.518 | Section 3 totals |
| Post-development load before treatment (kg/yr | lb/yr) | 197.21 | 434.77 | 48.587 | 107.116 | Section 3 totals |
| Reduction for post = pre (%) | 68.95 | 89.25 | Eq. 9-3 |
| Section 8.3 percentage standard (%) | 55.00 | 80.00 | AHVI 8.3.2 |
| Governing required reduction (%) | 68.95 | 89.25 | Greater of Section 8.3 % and Eq. 9-3 (AHVI 9.1 step 4, 9.3) |
| Maximum allowable post-development discharge load (kg/yr | lb/yr) | 61.24 | 135.01 | 5.224 | 11.518 | Eq. 9-4 |
| Catchment | BMP | Appendix O basis | Key design values | TN eff. (%) | TP eff. (%) |
|---|---|---|---|---|---|
| 1 – upstream one | Wet Detention | Appendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%). | Average annual residence time = 18.2 days Hydraulic capture efficiency = 60.0 % Non-DCIA CN = 76, DCIA = 17.9 % | 35.3 | 60.4 |
| 2 – Catchment 2 | Wet Detention | Appendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%). | Average annual residence time = 10.4 days Hydraulic capture efficiency = 65.0 % Non-DCIA CN = 76, DCIA = 17.8 % | 30.8 | 56.2 |
| 3 – Catchment 0 | Wet Detention | Appendix O – Wet Detention: residence time t = PPV / (annual runoff / 365); TP % = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]²; TN % = 43.75 t / (4.38 + t); capped at t = 200 days (79.9% TP, 42.8% TN) unless the designer supports a longer residence time; littoral zone credit per Appendix O (max 10%). | Average annual residence time = 10.2 days Hydraulic capture efficiency = 60.0 % Non-DCIA CN = 84, DCIA = 19.0 % | 27.6 | 50.5 |
Efficiencies are the stand-alone mean annual mass removal efficiencies of each BMP for its own catchment. Efficiencies actually credited in the routed system are in Section 6.
| Permanent Pool Volume (ac-ft) | 1.00 |
| Permanent Pool Volume for 31 days residence (ac-ft) | 1.71 |
| Average Residence Time (days) | 18.18 |
| Has Littoral Zone | True |
| Wetland Efficiency Credit (%) | 0.00 |
Warning (littoral zone credit used more than once): The wet pond in upstream one (this one) is routed in series with the wet pond in Catchment 2, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the series removal in the Summary and Complete reports is too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one. Keep it on the pond whose littoral zone is built and maintained.
| Permanent Pool Volume (ac-ft) | 1.25 |
| Permanent Pool Volume for 31 days residence (ac-ft) | 3.71 |
| Average Residence Time (days) | 10.44 |
| Has Littoral Zone | True |
| Wetland Efficiency Credit (%) | 0.00 |
Warning (littoral zone credit used more than once): The wet pond in Catchment 2 (this one) is routed in series with the wet pond in upstream one, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the series removal in the Summary and Complete reports is too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one. Keep it on the pond whose littoral zone is built and maintained.
| Permanent Pool Volume (ac-ft) | 2.50 |
| Permanent Pool Volume for 31 days residence (ac-ft) | 7.59 |
| Average Residence Time (days) | 10.21 |
| Has Littoral Zone | False |
| Wetland Efficiency Credit (%) | 0.00 |
BMPFast routes the annual runoff volume (Q) and TN / TP mass through the catchment network from upstream to downstream. At each node the upstream discharge and the node's own catchment load are summed and passed through the node's BMP, so the mass available to each downstream BMP is the reduced mass leaving the upstream BMP – this is Equation 9-5 expressed in mass rather than fraction form, and it also handles junctions where several inputs meet. Where consecutive nodes are all dry retention, all wet detention, or untreated areas draining to a single retention or detention system, the group is calculated as one system (a strand) using the combined retention depth or combined residence time, because in those cases the upstream unit changes the volume or residence time available to the downstream unit – the "identifiable causal relationship" for which Section 9.5.1 directs the designer to use a methodology other than the independent-efficiency form of Equation 9-5.
Q in ac-ft/yr; N and P in kg/yr; nodes listed in calculation (upstream to downstream) order.
Q in ac-ft/yr; N and P in kg/yr. Nodes are listed in calculation (upstream to downstream) order. Nodes in series calculated as a single system (a strand) are shown as one row, e.g. [1->8].
| Node # | Node Input(s) # | Upstream Inputs | Catchment Inputs | Removal % | Output(s) | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q | N | P | Q | N | P | N% | P% | Q | N | P | ||
| [1->2->3] Strand: All Catchments are Detention in Series | — | 0.00 | 0.00 | 0.00 | 89.39 | 197.21 | 48.59 | 42.3 | 66.7 | 89.39 | 113.73 | 16.17 |
| Outlet | 3 | 89.39 | 113.73 | 16.17 | — | — | — | — | — | 89.39 | 113.73 | 16.17 |
Warning (littoral zones in series): the wet ponds in upstream one and Catchment 2 are routed in series, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the removals in this report are too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one (keep it on the pond whose littoral zone is built and maintained).
| Quantity | Total Nitrogen | Total Phosphorus |
|---|---|---|
| Post-development load before treatment (kg/yr | lb/yr) | 197.21 | 434.77 | 48.587 | 107.116 |
| Post-development discharge load after treatment, at outlet (kg/yr | lb/yr) | 113.73 | 250.73 | 16.166 | 35.641 |
| Load removed (kg/yr | lb/yr) | 83.48 | 184.04 | 32.421 | 71.476 |
| Provided system treatment efficiency (%) | 42.33 | 66.73 |
| Required reduction (%) – Section 4 | 68.95 | 89.25 |
| Maximum allowable discharge load, Eq. 9-4 (kg/yr | lb/yr) | 61.24 | 135.01 | 5.224 | 11.518 |
| Predevelopment load (kg/yr | lb/yr) | 61.24 | 135.01 | 5.224 | 11.518 |
| Section 8.3 percentage standard met – TN (55%)? | No |
| Section 8.3 percentage standard met – TP (80%)? | No |
| Post-development discharge ≤ predevelopment load – TN? | No |
| Post-development discharge ≤ predevelopment load – TP? | No |
| Governing requirement met – TN? | No |
| Governing requirement met – TP? | No |
AHVI 9.5: where the maximum load is not met, modify the selected BMP or incorporate additional BMPs (or compensating treatment per 9.7) to achieve the required TN / TP load reductions.
| Predevelopment runoff volume (ac-ft/yr) | 23.54 |
| Post-development runoff volume from catchments (ac-ft/yr) | 93.91 |
| Post-development surface discharge at outlet (ac-ft/yr) | 0.00 |
Reviewer note: the runoff coefficient (Section 2), EMC (Section 3), Equation 9-1 / 9-2 loads, Equation 9-3 / 9-4 required treatment (Section 4) and BMP efficiencies (Section 5) can each be checked by hand against Appendices N and O and Tables 9.1 / 9.2 using the inputs printed in this report; the routing (Section 6) is the mass-form application of Equation 9-5.