Summary Treatment Report: All sites non-exempted
Warning (littoral zones in series): the wet ponds in upstream one and Catchment 2 are routed in series, and each is marked as having a littoral zone. In a series of wet ponds the littoral zone credit can be taken only once. A pond without the credit keeps 90 % of its removal, so the removals in this report are too high. Open 2. Enter Treatment, choose each of these catchments, click Wet Detention, and untick "Check if there is a littoral zone" on every pond in the series but one (keep it on the pond whose littoral zone is built and maintained).
Catchments and Associated BMP Types
| ID |
Catchment Name |
Catchment BMP |
Routing Destination |
| 1 |
upstream one |
Wet Detention |
Routed to Catchment 2 |
| 2 |
Catchment 2 |
Wet Detention |
Routed to Catchment 3 |
| 3 |
Catchment 0 |
Wet Detention |
Routed to Outlet |
Volume of Runoff Summary
| Scenario |
Catchment Area (acres) |
Runoff Volume (ac-ft/yr) |
Runoff Volume (in/year) |
| Pre-Condition |
83.29 |
23.54 |
3.39 |
| System Post-Condition (with BMPs) |
79.25 |
89.39 |
13.54 |
| Post-Condition (no BMP) |
79.25 |
89.39 |
13.54 |
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.
Summary of Removals
Summary Loading:
|
Specified (for All sites non-exempted) |
TN = 55.00%; |
TP = 80.00% |
|
Provided |
TN = 42.33%; |
TP = 66.73% |
% Specified Removal:
Is specified removal for total nitrogen removal met?
No
Is specified removal for total phosphorus removal met?
No
Results are compared against the analysis type targets. Percentages are shown to two decimals.
Pre vs. Post Removals
| Pre/Post |
TN = 68.95%; |
TP = 89.25% |
| Provided |
TN = 42.33%; |
TP = 66.73% |
% Removal:
Is removal (pre<=post) for total nitrogen removal met?
No
Is removal (pre<=post) for total phosphorus removal met?
No
Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.
Maximum Removals
| Maximum |
TN = 68.95%; |
TP = 89.25% |
| Provided |
TN = 42.33%; |
TP = 66.73% |
% Maximum Removal:
Is maximum removal for total nitrogen removal met?
No
Is maximum removal for total phosphorus removal met?
No
The maximum requirement is the greater of the Specified and Pre/Post removals. Percentages are shown to two decimals.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
| Nitrogen (N) |
| Total N pre load | 61.24 kg/yr |
| Total N post load | 197.21 kg/yr |
| Percent N load reduction | 42.33 % |
| Provided N discharge load | 113.73 kg/yr (250.78 lb/yr) |
| Provided N load removed (surface) | 83.48 kg/yr (184.07 lb/yr) |
| Phosphorus (P) |
| Total P pre load | 5.224 kg/yr |
| Total P post load | 48.587 kg/yr |
| Percent P load reduction | 66.73 % |
| Provided P discharge load | 16.166 kg/yr (35.647 lb/yr) |
| Provided P load removed (surface) | 32.421 kg/yr (71.488 lb/yr) |
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.