Summary Treatment Report: Specified Removal Efficiency

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 downstream Wet Detention Routed to Outlet
2 upstream No Treatment Routed to Catchment 1

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 100.00 100.02 12.00
System Post-Condition (with BMPs) 100.00 100.02 12.00
Post-Condition (no BMP) 100.00 100.02 12.00
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:
Specified (for Specified Removal Efficiency) TN = 75.00%; TP = 75.00%
Provided TN = 3.36%; TP = 33.92%

% Specified Removal:
Is specified removal for total nitrogen removal met?
No
Is specified removal for total phosphorus removal met?
No
Results are compared against the analysis type targets. Percentages are shown to two decimals.
No Pre/Post Analysis
Analysis Type: Specified Removal Efficiency
There are no pre/post targets for this analysis type.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load100.01 kg/yr
Total N post load100.01 kg/yr
Target N load reduction75.00 %
Target N discharge load25.00 kg/yr
Percent N load reduction3.36 %
Provided N discharge load96.65 kg/yr (213.11 lb/yr)
Provided N load removed (surface)3.37 kg/yr (7.42 lb/yr)
Phosphorus (P)
Total P pre load100.014 kg/yr
Total P post load100.014 kg/yr
Target P load reduction75.00 %
Target P discharge load25.003 kg/yr
Percent P load reduction33.92 %
Provided P discharge load66.086 kg/yr (145.719 lb/yr)
Provided P load removed (surface)33.928 kg/yr (74.811 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.