Summary Treatment Report: All sites non-exempted

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 upstream one Wet Detention Routed to Catchment 2
2 Catchment 2 Wet Detention Routed to Catchment 3
3 Catchment 0 Wet Detention Routed to Outlet

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 83.29 23.54 3.39
System Post-Condition (with BMPs) 79.25 89.39 13.54
Post-Condition (no BMP) 79.25 89.39 13.54
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:
Specified (for All sites non-exempted) TN = 55.00%; TP = 80.00%
Provided TN = 41.43%; TP = 65.79%

% Specified Removal:
Is specified removal for total nitrogen removal met?
No
Is specified removal for total phosphorus removal met?
No
Results are compared against the analysis type targets. Percentages are shown to two decimals.
Pre vs. Post Removals
Pre/Post TN = 68.95%; TP = 89.25%
Provided TN = 41.43%; TP = 65.79%

% Removal:
Is removal (pre<=post) for total nitrogen removal met?
No
Is removal (pre<=post) for total phosphorus removal met?
No
Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.
Maximum Removals
Maximum TN = 68.95%; TP = 89.25%
Provided TN = 41.43%; TP = 65.79%

% Maximum Removal:
Is maximum removal for total nitrogen removal met?
No
Is maximum removal for total phosphorus removal met?
No
The maximum requirement is the greater of the Specified and Pre/Post removals. Percentages are shown to two decimals.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load61.24 kg/yr
Total N post load197.21 kg/yr
Percent N load reduction41.43 %
Provided N discharge load115.50 kg/yr (254.67 lb/yr)
Provided N load removed (surface)81.71 kg/yr (180.18 lb/yr)
Phosphorus (P)
Total P pre load5.224 kg/yr
Total P post load48.587 kg/yr
Percent P load reduction65.79 %
Provided P discharge load16.621 kg/yr (36.648 lb/yr)
Provided P load removed (surface)31.967 kg/yr (70.487 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.