Multiple BMP in Series — Equations

System case

Case type: Retention to Wet Detention. Calculation used: Retention to Wet Detention (combined retention system, routed).

Retention [BMP 1 (Permeable Pavement)]  →  Routed wet detention [BMP 2 (Wet Detention)]

SegmentBMPsHow it is calculated
RetentionBMP 1 (Permeable Pavement)Treatment depths summed (Equivalent Treatment Depth); removal e from the retention lookup tables
Routed wet detentionBMP 2 (Wet Detention)Effective Residence Time from the volume the retention passes on; combined as e + (100 - e)(D/100 - a/100 x e/100), a = 10 (N), 20 (P)

Equations

Equivalent Treatment Depth (in) = sum of the Treatment Depths of the retention BMPs
Equivalent Treatment Efficiency e (%) = retention lookup (Equivalent Treatment Depth, non-DCIA CN, DCIA %, rainfall zone)
Volume to pond (ac-ft/yr) = Runoff x (100 - e) / 100
Effective Residence Time (days) = Permanent Pool Volume (ac-ft) / Volume to pond (ac-ft/yr) x 365
D = the pond's removal at the Effective Residence Time
Pond series contribution (%) = (100 - e) x (D / 100 - a / 100 x e / 100), a = 10 for N, 20 for P (not below 0)
Removal (%) = e + pond series contribution

Notes

Values

VariableCurrent value
ScenarioRetention to Wet Detention
Calculation usedRetention to Wet Detention (combined retention system, routed)
Runoff into the series13.903 ac-ft/yr
N load into the series21.428 kg/yr
P load into the series2.966 kg/yr
Equivalent Treatment Depth1.42 in
Equivalent Treatment Efficiency (e)79.053 %
Hydraulic Capture79.1 %
N removal (Multiple BMP)86.5 %
P removal (Multiple BMP)94.1 %
N load out (surface discharge)2.897 kg/yr
P load out (surface discharge)0.176 kg/yr

Calculation steps (values as used)

#StepCalculation (values used)Result
1Inflow to the seriescatchment runoff and loadsQ 13.903 ac-ft/yr, N 21.428 kg/yr, P 2.966 kg/yr
2Equivalent Treatment DepthBMP 1 (Permeable Pavement) 1.42 in1.42 in
3Equivalent Treatment Efficiency (e)retention lookup at 1.42 in, non-DCIA CN 80, DCIA 60 %, Florida Zone 579.05 %
4Volume passed to the pond13.903 x (100 - 79.053) / 1002.912 ac-ft/yr
5Effective Residence Time3.809 ac-ft / 2.912 ac-ft/yr x 365477.4 days
6Pond removal D at that residence timewet detention N and P equationsN 43.35 %, P 87.54 %
7Pond series contributionN: (100 - 79.053) x (43.352/100 - 10/100 x 79.053/100); P: (100 - 79.053) x (87.539/100 - 20/100 x 79.053/100) (not below 0)N 7.42 %, P 15.02 %
8Removal through the pond (e + pond contribution)N: 79.053 + 7.425; P: 79.053 + 15.025N 86.48 %, P 94.08 %
9Loads out of the retention systemload in x (100 - e) / 100N 4.488 kg/yr, P 0.621 kg/yr
10Loads out of the Wet Detentionits load in, less its series contribution expressed on the flow reaching itN 2.897 kg/yr, P 0.176 kg/yr

BMP 1: Permeable Pavement

Part of the combined retention system: its Treatment Depth is added into the Equivalent Treatment Depth. Its own N and P removal below is not applied separately.

Equations
Storage (ac-ft) = Surface Area (ac) x Sum over layers [Layer Thickness (in) x Sustainable Void (%) / 100] x Layer Scale Factor / 12
Treatment Depth (in) = Storage / Watershed Area (ac) x 12
Notes
Values
VariableCurrent value
Contributing Area2.960 ac
Watershed Area5.000 ac
Non-DCIA Curve Number80
DCIA Percent60 %
Rainfall ZoneFlorida Zone 5
Treatment Depth1.420 in
Hydraulic Capture79.1 %
Treatment Rate(no media mix)
N removal79.1 %
P removal79.1 %
Recovery-Time Adjustment

The efficiency from the retention lookup tables is raised by an adjustment that depends on the Treatment Depth and on how quickly the design volume is recovered.

Equations
x = Treatment Depth (in), T = Time to Recover Design Volume (hr)
T <= 3 hr: Adjustment (%) = -0.1365 x^4 + 1.5228 x^3 - 5.0475 x^2 + 2.3674 x + 8.8133
3 < T <= 36 hr: Adjustment (%) = 0.0083 x^4 - 0.1518 x^3 + 1.0071 x^2 - 3.0705 x + 3.7676
Hydraulic Capture (%) = Lookup Table Capture (%) + Adjustment
N removal (%) = P removal (%) = Lookup Table Capture (%) + Adjustment
Notes
VariableCurrent value
Time to Recover Design Volume (T)72 hr
Treatment Depth (x)1.420 in
Curve usedT > 36 hr: no adjustment
Recovery Time Adjustment0.00 %

BMP 2: Wet Detention

Receives what the retention system passes on; its residence time is re-derived from that volume (see the steps above).

Equations
Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365
N removal (%) = 43.75 x rt / (4.38 + rt)
P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2
No littoral zone: N removal = N removal x 0.90, P removal = P removal x 0.90
Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100
P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100
Notes
Values
VariableCurrent value
Wetland Efficiency Credit0.00 %
Permanent Pool Volume3.81 ac-ft
Annual Runoff Volume13.90 ac-ft
Treatment Rate(no media mix)
N removal43.4 %
P removal87.5 %
Effective Residence Time (routed)477.4 days
Pond N removal at that residence time43.352 %
Pond P removal at that residence time87.539 %
N series contribution7.425 %
P series contribution15.025 %