Summary Treatment Report: Net Improvement

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 Subdivision Stormwater Harvesting Routed to Outlet

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 40.00 5.40 1.62
System Post-Condition (with BMPs) 40.00 4.37 1.31
Post-Condition (no BMP) 40.00 43.67 13.10
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

No Specified % Removals
Analysis Type: Net Improvement
There are no specified % removals defined for this analysis type.
Pre vs. Post Removals
Pre/Post TN = 78.83%; TP = 77.57%
Provided TN = 90.00%; TP = 90.00%

% Removal:
Is removal (pre<=post) for total nitrogen removal met?
Yes
Is removal (pre<=post) for total phosphorus removal met?
Yes
Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load20.17 kg/yr
Total N post load95.30 kg/yr
Target N load reduction78.83 %
Target N discharge load20.17 kg/yr
Percent N load reduction90.00 %
Provided N discharge load9.53 kg/yr (21.01 lb/yr)
Provided N load removed (surface)85.77 kg/yr (189.12 lb/yr)
Phosphorus (P)
Total P pre load3.948 kg/yr
Total P post load17.606 kg/yr
Target P load reduction77.57 %
Target P discharge load3.948 kg/yr
Percent P load reduction90.00 %
Provided P discharge load1.761 kg/yr (3.882 lb/yr)
Provided P load removed (surface)15.845 kg/yr (34.939 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.