Summary Treatment Report: Specified Removal Efficiency

Catchments and Associated BMP Types

ID Catchment Name Catchment BMP Routing Destination
1 Commercial site User Defined BMP Routed to Outlet

Volume of Runoff Summary

Scenario Catchment Area (acres) Runoff Volume (ac-ft/yr) Runoff Volume (in/year)
Pre-Condition 20.00 7.02 4.21
System Post-Condition (with BMPs) 20.00 5.36 3.22
Post-Condition (no BMP) 20.00 53.64 32.18
Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.
The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:
Specified (for Specified Removal Efficiency) TN = 60.00%; TP = 85.00%
Provided TN = 50.00%; TP = 90.00%

% Specified Removal:
Is specified removal for total nitrogen removal met?
No
Is specified removal for total phosphorus removal met?
Yes
Results are compared against the analysis type targets. Percentages are shown to two decimals.
No Pre/Post Analysis
Analysis Type: Specified Removal Efficiency
There are no pre/post targets for this analysis type.
Nitrogen & Phosphorus Loading
Surface water and groundwater loading summary
Nitrogen (N)
Total N pre load9.41 kg/yr
Total N post load158.73 kg/yr
Target N load reduction60.00 %
Target N discharge load63.49 kg/yr
Percent N load reduction50.00 %
Provided N discharge load79.37 kg/yr (175.00 lb/yr)
Provided N load removed (surface)79.37 kg/yr (175.00 lb/yr)
Phosphorus (P)
Total P pre load0.372 kg/yr
Total P post load22.818 kg/yr
Target P load reduction85.00 %
Target P discharge load3.423 kg/yr
Percent P load reduction90.00 %
Provided P discharge load2.282 kg/yr (5.031 lb/yr)
Provided P load removed (surface)20.536 kg/yr (45.282 lb/yr)
Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.