Wet Detention

Analysis type: Redevelopment + OFW — Wet Detention on Subdivision (stand-alone: this catchment's runoff only)
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Wet Detention Input Variables

Permanent Pool Volume3.00 ac-ft
Permanent Pool Volume for 31 days residence0.93 ac-ft
Average Residence Time100.31 days
Has Littoral ZoneYes
Wetland Efficiency Credit0.00 %

Littoral zone: the pond has one, so a credit of 10.00 percentage points is added to the N and P removal from the wet pond equations (Appendix O, Table 1: "Maximum 10% removal with a minimum littoral zone area"; the equations are taken as a pond without one).

Watershed Characteristics

Watershed Area10.00 acres
Contributing Area to BMP10.00 ac
Watershed Non-DCIA Curve Number (0-100)75
Watershed DCIA Percent25.00 %
Rainfall ZoneFlorida Zone 2
Rainfall50.00 in

Surface Water Discharge

Provided Nitrogen Treatment Efficiency51.9 %
Provided Phosphorus Treatment Efficiency84.0 %

Surface Discharge Load Diagram for Wet Detention (stand-alone)

Runoff input is only from this catchment, no routing is performed here

Load

N23.82 kg/yr
P4.40 kg/yr
Q10.92 ac-ft/yr

Treatment

N52 %
P84 %

Surface Discharge

N11.46 kg/yr
P0.70 kg/yr
Q10.92 ac-ft/yr

Mass Reduction

N12.37 kg/yr
P3.70 kg/yr
Q0.00 ac-ft/yr

Anoxic depth

The following calculations are based on the mean annual stormwater mass

remaining in the wet detention pond. The equations are from Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49),

and valid for anoxic depths from 0.8 to 29.5 feet.

WET DETENTION AS A FIRST BMP: Subdivision

ParameterValue
Overall Provided Phosphorus Treatment Efficiency (%)74.017
Mean Annual Pond TP Concentration (ug/l)84.965
Mean chlorophyll-a concentration (mg/m^3)43.202
Mean Secchi Disk Depth (m)0.759
Anoxic Pool Depth (ft)9.234

Note: If anoxic depth < pond depth, recalculate permanent pool volume using the anoxic

depth and re-enter the permanent pool volume.

Equations

The equations behind the values above, and the values they are worked with (v1's Equations page).

Wet Detention — Equations

Equations

Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365

N removal (%) = 43.75 x rt / (4.38 + rt)

P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2

Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)

Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100

P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100

Notes

Residence Time is capped at 200 days unless ART > 200 is allowed.

The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).

N and P removal cannot exceed 100%.

Values

VariableCurrent value
Wetland Efficiency Credit0.00 %
Permanent Pool Volume3.00 ac-ft
Annual Runoff Volume10.92 ac-ft
Treatment Rate(no media mix)
N removal51.9 %
P removal84.0 %