Routing 1 — Summary Report

Analysis type: Specified Removal Efficiency
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Specified Removal Efficiency

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1SubdivisionWet DetentionRouted to Outlet

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition10.001.351.62
System Post-Condition (with BMPs)10.0010.9213.10
Post-Condition (no BMP)10.0010.9213.10

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:

Specified (for Specified Removal Efficiency)TN = 70.00%;TP = 85.00%
ProvidedTN = 51.92%;TP = 84.02%

% Specified Removal:

Is specified removal for total nitrogen removal met? No

Is specified removal for total phosphorus removal met? No

Results are compared against the analysis type targets. Percentages are shown to two decimals.

No Pre/Post Analysis

Analysis Type: Specified Removal Efficiency

There are no pre/post targets for this analysis type.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load5.04 kg/yr
Total N post load23.82 kg/yr
Target N load reduction70.00 %
Target N discharge load7.15 kg/yr
Percent N load reduction51.92 %
Provided N discharge load11.46 kg/yr (25.26 lb/yr)
Provided N load removed (surface)12.37 kg/yr (27.28 lb/yr)

Phosphorus (P)
Total P pre load0.987 kg/yr
Total P post load4.402 kg/yr
Target P load reduction85.00 %
Target P discharge load0.660 kg/yr
Percent P load reduction84.02 %
Provided P discharge load0.704 kg/yr (1.551 lb/yr)
Provided P load removed (surface)3.698 kg/yr (8.154 lb/yr)

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.