Routing 1

Composite CN: pre-development pasture and woods — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading53.82 kg/yr
Total Catchment Nitrogen Loading53.82 kg/yr
Provided Nitrogen Treatment Efficiency0.00 %

Phosphorus

Total Outlet Phosphorus Loading9.94 kg/yr
Total Catchment Phosphorus Loading9.94 kg/yr
Provided Phosphorus Treatment Efficiency0.00 %

Runoff and area

Pre-development runoff volume6.10 ac-ft/yr
Post-development runoff volume leaving the site24.66 ac-ft/yr
Pre-Condition Catchment Area20.00 ac
Post Condition Catchment Area20.00 ac

Requirement

Type of analysisAll sites non-exempted
Nitrogen Removal Performance Specified (by the type of analysis)55.00 %
Phosphorus Removal Performance Specified (by the type of analysis)80.00 %
Nitrogen removal for post = pre57.7 %
Phosphorus removal for post = pre55.2 %
Nitrogen removal to meet (the greater)57.7 %
Phosphorus removal to meet (the greater)80.0 %

Meets the required removal? Nitrogen: no (0.00 % provided, 57.7 % needed). Phosphorus: no (0.00 % provided, 80.0 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
SiteOutletNo treatment