Routing 1
Composite EMC: pre-development, phosphorus — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 104.78 kg/yr |
| Total Catchment Nitrogen Loading | 104.78 kg/yr |
| Provided Nitrogen Treatment Efficiency | 0.00 % |
Phosphorus
| Total Outlet Phosphorus Loading | 19.36 kg/yr |
| Total Catchment Phosphorus Loading | 19.36 kg/yr |
| Provided Phosphorus Treatment Efficiency | 0.00 % |
Runoff and area
| Pre-development runoff volume | 9.36 ac-ft/yr |
| Post-development runoff volume leaving the site | 48.01 ac-ft/yr |
| Pre-Condition Catchment Area | 40.00 ac |
| Post Condition Catchment Area | 40.00 ac |
Requirement
| Type of analysis | All sites non-exempted |
| Nitrogen Removal Performance Specified (by the type of analysis) | 55.00 % |
| Phosphorus Removal Performance Specified (by the type of analysis) | 80.00 % |
| Nitrogen removal for post = pre | 72.5 % |
| Phosphorus removal for post = pre | 73.6 % |
| Nitrogen removal to meet (the greater) | 72.5 % |
| Phosphorus removal to meet (the greater) | 80.0 % |
Meets the required removal? Nitrogen: no (0.00 % provided, 72.5 % needed). Phosphorus: no (0.00 % provided, 80.0 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Farm | Outlet | No treatment | |