BMPs in Series — calculations

Example #4 with harvesting pond — BMPs in Series on catchment #1 (stand-alone: this catchment's runoff only)
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

How this treatment's values are worked out: the equations, then the values they are worked with (v1's Equations button). A change on the Entry or Sizing tab shows here at once.

System case

Case type: Wet Detention to Stormwater Harvesting. Calculation used: Wet Detention to Stormwater Harvesting.

Wet detention [BMP 1 (Wet Detention)] → Treatment train (stormwater harvesting) [BMP 2 (Stormwater Harvesting)]

SegmentBMPsHow it is calculated
Wet detentionBMP 1 (Wet Detention)Its own removal
Treatment train (stormwater harvesting)BMP 2 (Stormwater Harvesting)Added to the removal so far: E = E1 + E2(1 - E1/100); its removal also sets the hydraulic capture

Equations

Treatment train: E (%) = E1 + E2 x (1 - E1 / 100)

Applied to each BMP in turn

Hydraulic Capture (%) = the last harvesting / downstream BMP's N removal

Notes

The Multiple BMP detects its scenario from the BMPs in the series and uses the calculation named above.

The steps table lists every calculation in the order it was made, with the values used.

Each BMP's section shows its own equations and its values as they stand after the series calculation.

Values

VariableCurrent value
ScenarioWet Detention to Stormwater Harvesting
Calculation usedWet Detention to Stormwater Harvesting
Runoff into the series18.046 ac-ft/yr
N load into the series27.813 kg/yr
P load into the series3.849 kg/yr
Hydraulic Capture52.7 %
N removal (Multiple BMP)78.8 %
P removal (Multiple BMP)90.8 %
N load out (surface discharge)5.894 kg/yr
P load out (surface discharge)0.355 kg/yr

Calculation steps (values as used)

#StepCalculation (values used)Result
1Inflow to the seriescatchment runoff and loadsQ 18.046 ac-ft/yr, N 27.813 kg/yr, P 3.849 kg/yr
2Combine BMP 1 and BMP 2N: 55.204 + 52.691 x (1 - 55.204/100); P: 80.485 + 52.691 x (1 - 80.485/100)N 78.81 %, P 90.77 %
3Hydraulic Capture= BMP 2 (harvesting) N removal52.69 %

BMP 1: Wet Detention with Floating Wetland Mats

Its N and P removal below is combined with the rest of the series as shown in the steps above.

Equations

Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365

N removal (%) = 43.75 x rt / (4.38 + rt)

P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2

Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)

Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100

P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100

Notes

Residence Time is capped at 200 days unless ART > 200 is allowed.

The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).

N and P removal cannot exceed 100%.

Values

VariableCurrent value
Wetland Efficiency Credit10.00 %
Permanent Pool Volume2.47 ac-ft
Annual Runoff Volume18.05 ac-ft
Treatment Rate(no media mix)
N removal55.2 %
P removal80.5 %

BMP 2: Stormwater Harvesting

Its N and P removal below is combined with the rest of the series as shown in the steps above.

Equations

x = Harvest Volume (ac-ft) x 12 / (Watershed Area (ac) x ROC)

y = Harvest Rate (in/week) x Irrigation Area (ac) / 7 / (Watershed Area (ac) x ROC)

Harvest Efficiency (%) = REV table lookup of (x, y)

Water Use (MGY) = Harvest Rate (in/week) x 52 / 12 x Irrigation Area (ac) x 0.32585 MG/ac-ft

Harvested Water Supply (MGY) = Annual Runoff Volume (ac-ft/yr) x Harvest Efficiency / 100 x 0.32585 MG/ac-ft

Supplemental Water Needed (MGY) = Water Use - Harvested Water Supply (0 when the supply covers the use)

Notes

ROC is the catchment's annual runoff coefficient.

Harvest Efficiency is capped at 90%. Below 20%, the lowest REV curve, it is extended along the line between the 20% and 30% curves (beyond the published curves).

N and P removal are equal to the Harvest Efficiency.

Treatment Depth is back-calculated as the retention depth giving the same efficiency in the retention tables.

Values: the harvest efficiency is read from the REV curves of the Rainfall Zone. Non-DCIA Curve Number, DCIA Percent and Treatment Rate are listed for every retention-type BMP but are not used to calculate the harvest efficiency. Non-DCIA Curve Number and DCIA Percent are used only to back-calculate the Treatment Depth.

Values

VariableCurrent value
Available Harvest Volume1.00 ac-ft
Total Area Available for Irrigation3.00 acres
Available Harvest Rate0.80 in/week
Contributing Area5.000 ac
Watershed Area5.000 ac
Non-DCIA Curve Number80
DCIA Percent85 %
Rainfall ZoneFlorida Zone 5
Treatment Depth0.672 in
Hydraulic Capture52.7 %
Treatment Rate(no media mix)
N removal52.7 %
P removal52.7 %