Routing 1
Example #4 with harvesting pond — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 5.89 kg/yr |
| Total Catchment Nitrogen Loading | 27.81 kg/yr |
| Provided Nitrogen Treatment Efficiency | 78.81 % |
Phosphorus
| Total Outlet Phosphorus Loading | 0.36 kg/yr |
| Total Catchment Phosphorus Loading | 3.85 kg/yr |
| Provided Phosphorus Treatment Efficiency | 90.77 % |
Runoff and area
| Pre-development runoff volume | 11.66 ac-ft/yr |
| Post-development runoff volume leaving the site | 8.54 ac-ft/yr |
| Pre-Condition Catchment Area | 5.50 ac |
| Post Condition Catchment Area | 5.00 ac |
Requirement
| Type of analysis | Net Improvement |
| Nitrogen removal for post = pre | 35.4 % |
| Phosphorus removal for post = pre | 35.4 % |
| Nitrogen removal to meet (the greater) | 35.4 % |
| Phosphorus removal to meet (the greater) | 35.4 % |
Meets the required removal? Nitrogen: yes (78.81 % provided, 35.4 % needed). Phosphorus: yes (90.77 % provided, 35.4 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| catchment #1 | Outlet | BMPs in Series | |