Cost analysis 1 — Cost summary

Example #4 with harvesting pond
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Routing 1, at a discount rate of 3.30 % over 30 years.

Unit Cost Summary Report

Project: Example #4 with harvesting pond Date: 10/20/2026

Interest Rate: 3.3% Project Duration: 30 years

Table 1 — BMP Lifecycle Cost Breakdown

CatchmentBMP TypeConst. LowConst. HighPV Repl. LowPV Repl. HighPV O&M LowPV O&M HighPV LowPV HighAnn. LowAnn. High$/lb TN Low$/lb TN High$/lb TP Low$/lb TP High
catchment #1Multiple BMP¤175,000¤265,000¤34,240¤51,360¤99,420¤143,632¤308,660¤459,992¤16,364¤24,388¤212.88¤317.25¤1,335.46¤1,990.22
Project Totals¤308,660¤459,992

Table 2 — Unit Cost Summary (FSAEF Format)

MetricTNTP
Annual Reduction (lbs/yr)48.37.7
Lifecycle Reduction (lbs)1,450231
Unit Cost Low ($/lb)¤212.88¤1,335.46
Unit Cost High ($/lb)¤317.25¤1,990.22

Cost per pound = Present Worth / (pounds removed per year x service life). The present worth is discounted to today and the pounds are not. Annualized cost / pounds removed per year, another common form, gives a higher figure when the discount rate is above 0.