Routing 1
Media mix: surface discharge filter, none vs B_G CTS12 — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 6.80 kg/yr |
| Total Catchment Nitrogen Loading | 11.91 kg/yr |
| Provided Nitrogen Treatment Efficiency | 42.90 % |
Phosphorus
| Total Outlet Phosphorus Loading | 0.78 kg/yr |
| Total Catchment Phosphorus Loading | 2.20 kg/yr |
| Provided Phosphorus Treatment Efficiency | 64.35 % |
Runoff and area
| Pre-development runoff volume | 0.68 ac-ft/yr |
| Post-development runoff volume leaving the site | 1.56 ac-ft/yr |
| Pre-Condition Catchment Area | 5.00 ac |
| Post Condition Catchment Area | 5.00 ac |
Requirement
| Type of analysis | BMP Analysis |
This type of analysis sets no removal to meet, so there is no pass or fail here.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Subdivision | Outlet | Surface Discharge Filter | |