Routing 1
Permeable pavement: redevelopment — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 1.86 kg/yr |
| Total Catchment Nitrogen Loading | 23.66 kg/yr |
| Provided Nitrogen Treatment Efficiency | 92.15 % |
Phosphorus
| Total Outlet Phosphorus Loading | 0.27 kg/yr |
| Total Catchment Phosphorus Loading | 3.40 kg/yr |
| Provided Phosphorus Treatment Efficiency | 92.15 % |
Runoff and area
| Pre-development runoff volume | 0.92 ac-ft/yr |
| Post-development runoff volume leaving the site | 0.63 ac-ft/yr |
| Pre-Condition Catchment Area | 3.00 ac |
| Post Condition Catchment Area | 3.00 ac |
Requirement
| Type of analysis | Redevelopment |
| Nitrogen Removal Performance Specified (by the type of analysis) | 45.00 % |
| Phosphorus Removal Performance Specified (by the type of analysis) | 80.00 % |
| Nitrogen removal to meet (the greater) | 45.0 % |
| Phosphorus removal to meet (the greater) | 80.0 % |
Meets the required removal? Nitrogen: yes (92.15 % provided, 45.0 % needed). Phosphorus: yes (92.15 % provided, 80.0 % needed). The removal needed is the type of analysis's percentage.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Commercial site | Outlet | Permeable Pavement | |