Routing 1 — Summary Report

Permeable pavement: redevelopment
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Redevelopment

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1Commercial sitePermeable PavementRouted to Outlet

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition3.000.923.69
System Post-Condition (with BMPs)3.000.632.51
Post-Condition (no BMP)3.008.0031.98

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:

Specified (for Redevelopment)TN = 45.00%;TP = 80.00%
ProvidedTN = 92.15%;TP = 92.15%

% Specified Removal:

Is specified removal for total nitrogen removal met? Yes

Is specified removal for total phosphorus removal met? Yes

Results are compared against the analysis type targets. Percentages are shown to two decimals.

No Pre/Post Analysis

Analysis Type: Redevelopment

There are no pre/post targets for this analysis type.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load1.24 kg/yr
Total N post load23.66 kg/yr
Percent N load reduction92.15 %
Provided N discharge load1.86 kg/yr (4.09 lb/yr)
Provided N load removed (surface)21.80 kg/yr (48.07 lb/yr)

Phosphorus (P)
Total P pre load0.049 kg/yr
Total P post load3.401 kg/yr
Percent P load reduction92.15 %
Provided P discharge load0.267 kg/yr (0.589 lb/yr)
Provided P load removed (surface)3.134 kg/yr (6.911 lb/yr)

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.