Storage (ac-ft) = Surface Area (ac) x Sum over layers [Layer Thickness (in) x Sustainable Void (%) / 100] x Layer Scale Factor / 12

Treatment Depth (in) = Storage / Watershed Area (ac) x 12

Notes

Sizing scales every pavement layer by the same factor: 1.0 is the layers as entered, 1.5 makes each layer half again as thick. Apply multiplies each layer thickness by the factor; Cancel leaves the layers as they were.

With no layers entered, sizing starts from 12 in of User Defined(20).

Hydraulic capture efficiency is read from the retention efficiency lookup tables for the Treatment Depth.

The lookup also depends on the watershed's non-DCIA curve number, DCIA percent and rainfall zone.

N and P removal are equal to the hydraulic capture efficiency.

A recovery-time adjustment for Time to Recover Design Volume is added to the capture efficiency and to N and P removal (see Recovery-Time Adjustment).

Values

VariableCurrent value
Contributing Area1.800 ac
Watershed Area3.000 ac
Non-DCIA Curve Number80
DCIA Percent70 %
Rainfall ZoneFlorida Zone 4
Treatment Depth2.392 in
Hydraulic Capture92.2 %
Treatment Rate(no media mix)
N removal92.2 %
P removal92.2 %