Routing 1 — Summary Report

Rain garden: detention with underdrain
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Net Improvement

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1TownhomesRain GardenRouted to Outlet

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition1.000.192.23
System Post-Condition (with BMPs)1.002.0624.75
Post-Condition (no BMP)1.002.0624.75

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

No Specified % Removals

Analysis Type: Net Improvement

There are no specified % removals defined for this analysis type.

Pre vs. Post Removals

Pre/PostTN = 85.19%;TP = 89.75%
ProvidedTN = 60.00%;TP = 90.00%

% Removal:

Is removal (pre<=post) for total nitrogen removal met? No

Is removal (pre<=post) for total phosphorus removal met? Yes

Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load0.69 kg/yr
Total N post load4.68 kg/yr
Target N load reduction85.19 %
Target N discharge load0.69 kg/yr
Percent N load reduction60.00 %
Provided N discharge load1.87 kg/yr (4.13 lb/yr)
Provided N load removed (surface)2.81 kg/yr (6.19 lb/yr)

Phosphorus (P)
Total P pre load0.136 kg/yr
Total P post load1.322 kg/yr
Target P load reduction89.75 %
Target P discharge load0.136 kg/yr
Percent P load reduction90.00 %
Provided P discharge load0.132 kg/yr (0.292 lb/yr)
Provided P load removed (surface)1.190 kg/yr (2.624 lb/yr)

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.