Routing 1

Rainwater harvesting: school, flat roof — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading0.71 kg/yr
Total Catchment Nitrogen Loading4.63 kg/yr
Provided Nitrogen Treatment Efficiency84.62 %

Phosphorus

Total Outlet Phosphorus Loading0.08 kg/yr
Total Catchment Phosphorus Loading0.53 kg/yr
Provided Phosphorus Treatment Efficiency84.62 %

Runoff and area

Pre-development runoff volume0.35 ac-ft/yr
Post-development runoff volume leaving the site0.55 ac-ft/yr
Pre-Condition Catchment Area1.00 ac
Post Condition Catchment Area1.00 ac

Requirement

Type of analysisRedevelopment + OFW
Nitrogen Removal Performance Specified (by the type of analysis)60.00 %
Phosphorus Removal Performance Specified (by the type of analysis)90.00 %
Nitrogen removal to meet (the greater)60.0 %
Phosphorus removal to meet (the greater)90.0 %

Meets the required removal? Nitrogen: yes (84.62 % provided, 60.0 % needed). Phosphorus: no (84.62 % provided, 90.0 % needed). The removal needed is the type of analysis's percentage.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
School roofOutletRainwater Harvesting