Wet Detention

Detention in series 2020 TAC manual page 194 — Wet Detention on Catchment 0 (stand-alone: this catchment's runoff only)
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Wet Detention Input Variables

Permanent Pool Volume2.50 ac-ft
Permanent Pool Volume for 31 days residence3.88 ac-ft
Average Residence Time19.98 days
Has Littoral ZoneNo
Wetland Efficiency Credit0.00 %

Littoral zone: none, so the removal is the wet pond equations' (taken as a pond without a littoral zone), with no credit.

Watershed Characteristics

Watershed Area35.71 acres
Contributing Area to BMP35.71 ac
Watershed Non-DCIA Curve Number (0-100)84
Watershed DCIA Percent19.00 %
Rainfall ZoneFlorida Zone 4
Rainfall52.00 in

Surface Water Discharge

Provided Nitrogen Treatment Efficiency35.9 %
Provided Phosphorus Treatment Efficiency61.1 %

Surface Discharge Load Diagram for Wet Detention (stand-alone)

Runoff input is only from this catchment, no routing is performed here

Load

N102.26 kg/yr
P25.51 kg/yr
Q45.67 ac-ft/yr

Treatment

N36 %
P61 %

Surface Discharge

N65.56 kg/yr
P9.92 kg/yr
Q45.67 ac-ft/yr

Mass Reduction

N36.69 kg/yr
P15.59 kg/yr
Q0.00 ac-ft/yr

Anoxic depth

The following calculations are based on the mean annual stormwater mass

remaining in the wet detention pond. The equations are from Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49),

and valid for anoxic depths from 0.8 to 29.5 feet.

WET DETENTION AS A FIRST BMP: Catchment 0

ParameterValue
Overall Provided Phosphorus Treatment Efficiency (%)61.123
Mean Annual Pond TP Concentration (ug/l)176.112
Mean chlorophyll-a concentration (mg/m^3)93.414
Mean Secchi Disk Depth (m)0.529
Anoxic Pool Depth (ft)9.025

Note: If anoxic depth < pond depth, recalculate permanent pool volume using the anoxic

depth and re-enter the permanent pool volume.

Equations

The equations behind the values above, and the values they are worked with (v1's Equations page).

Wet Detention — Equations

Equations

Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365

N removal (%) = 43.75 x rt / (4.38 + rt)

P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2

Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)

Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100

P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100

Notes

Residence Time is capped at 200 days unless ART > 200 is allowed.

The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).

N and P removal cannot exceed 100%.

Values

VariableCurrent value
Wetland Efficiency Credit0.00 %
Permanent Pool Volume2.50 ac-ft
Annual Runoff Volume45.67 ac-ft
Treatment Rate(no media mix)
N removal35.9 %
P removal61.1 %