How this treatment's values are worked out: the equations, then the values they are worked with (v1's Equations button). A change on the Entry or Sizing tab shows here at once.
Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365
N removal (%) = 43.75 x rt / (4.38 + rt)
P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2
Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)
Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100
P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100
Residence Time is capped at 200 days unless ART > 200 is allowed.
The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).
N and P removal cannot exceed 100%.
| Variable | Current value |
|---|---|
| Wetland Efficiency Credit | 0.00 % |
| Permanent Pool Volume | 1.00 ac-ft |
| Annual Runoff Volume | 20.08 ac-ft |
| Treatment Rate | (no media mix) |
| N removal | 45.3 % |
| P removal | 70.4 % |