Routing 1

no BMP upstream detention — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading86.65 kg/yr
Total Catchment Nitrogen Loading100.01 kg/yr
Provided Nitrogen Treatment Efficiency13.36 %

Phosphorus

Total Outlet Phosphorus Loading56.08 kg/yr
Total Catchment Phosphorus Loading100.01 kg/yr
Provided Phosphorus Treatment Efficiency43.92 %

Runoff and area

Pre-development runoff volume100.02 ac-ft/yr
Post-development runoff volume leaving the site100.02 ac-ft/yr
Pre-Condition Catchment Area100.00 ac
Post Condition Catchment Area100.00 ac

Requirement

Type of analysisSpecified Removal Efficiency
Nitrogen Removal Performance Specified (by the type of analysis)75.00 %
Phosphorus Removal Performance Specified (by the type of analysis)75.00 %
Nitrogen removal to meet (the greater)75.0 %
Phosphorus removal to meet (the greater)75.0 %

Meets the required removal? Nitrogen: no (13.36 % provided, 75.0 % needed). Phosphorus: no (43.92 % provided, 75.0 % needed). The removal needed is the type of analysis's percentage.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
downstreamOutletWet Detention
upstreamdownstreamNo treatment