Routing 1 — Summary Report

no BMP upstream detention
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Specified Removal Efficiency

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1downstreamWet DetentionRouted to Outlet
2upstreamNo TreatmentRouted to Catchment 1

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition100.00100.0212.00
System Post-Condition (with BMPs)100.00100.0212.00
Post-Condition (no BMP)100.00100.0212.00

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:

Specified (for Specified Removal Efficiency)TN = 75.00%;TP = 75.00%
ProvidedTN = 13.36%;TP = 43.92%

% Specified Removal:

Is specified removal for total nitrogen removal met? No

Is specified removal for total phosphorus removal met? No

Results are compared against the analysis type targets. Percentages are shown to two decimals.

No Pre/Post Analysis

Analysis Type: Specified Removal Efficiency

There are no pre/post targets for this analysis type.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load100.01 kg/yr
Total N post load100.01 kg/yr
Target N load reduction75.00 %
Target N discharge load25.00 kg/yr
Percent N load reduction13.36 %
Provided N discharge load86.65 kg/yr (191.06 lb/yr)
Provided N load removed (surface)13.37 kg/yr (29.47 lb/yr)

Phosphorus (P)
Total P pre load100.014 kg/yr
Total P post load100.014 kg/yr
Target P load reduction75.00 %
Target P discharge load25.003 kg/yr
Percent P load reduction43.92 %
Provided P discharge load56.084 kg/yr (123.666 lb/yr)
Provided P load removed (surface)43.929 kg/yr (96.864 lb/yr)

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.