Routing 1

Detention in series 2020 TAC manual page 194 — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading106.77 kg/yr
Total Catchment Nitrogen Loading197.21 kg/yr
Provided Nitrogen Treatment Efficiency45.86 %

Phosphorus

Total Outlet Phosphorus Loading14.12 kg/yr
Total Catchment Phosphorus Loading48.59 kg/yr
Provided Phosphorus Treatment Efficiency70.94 %

Runoff and area

Pre-development runoff volume23.54 ac-ft/yr
Post-development runoff volume leaving the site89.39 ac-ft/yr
Pre-Condition Catchment Area83.29 ac
Post Condition Catchment Area79.25 ac

Requirement

Type of analysisAll sites non-exempted
Nitrogen Removal Performance Specified (by the type of analysis)55.00 %
Phosphorus Removal Performance Specified (by the type of analysis)80.00 %
Nitrogen removal for post = pre68.9 %
Phosphorus removal for post = pre89.2 %
Nitrogen removal to meet (the greater)68.9 %
Phosphorus removal to meet (the greater)89.2 %

Meets the required removal? Nitrogen: no (45.86 % provided, 68.9 % needed). Phosphorus: no (70.94 % provided, 89.2 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
upstream oneCatchment 2Wet Detention
Catchment 2Catchment 0Wet Detention
Catchment 0OutletWet Detention