Routing 1 — Full Routing Diagram

Detention in series 2020 TAC manual page 194
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Full Routing Diagram — Balance Blocks

Each block shows upstream routing, inputs, treatment efficiencies, outputs and mass reduction for the selected BMP.

Catchment 1 Wet Detention
Upstream Nodes Node: 1Input Load In N: 44.95 kg/yr P: 11.21 kg/yr Q: 20.08 ac-ft/yr→Treatment Treatment N: 45.26 % P: 70.40 % ART: 18.18 days→Output Mass Discharged N: 24.61 kg/yr P: 3.32 kg/yr Q: 20.08 ac-ft/yr
↓
Mass Reduction Mass Reduction N: 20.34 kg/yr P: 7.89 kg/yr Q: 0.00 ac-ft/yr

N=Nitrogen, P=Phosphorus, ART=Detention Residence Time, TD = Retention Treatment Depth

Catchment 2 Wet Detention
Upstream Nodes Node: 1 Node: 2Input Load In N: 74.61 kg/yr P: 15.18 kg/yr Q: 43.72 ac-ft/yr→Treatment Treatment N: 30.82 % P: 56.25 % ART: 10.44 days→Output Mass Discharged N: 51.62 kg/yr P: 6.64 kg/yr Q: 43.72 ac-ft/yr
↓
Mass Reduction Mass Reduction N: 22.99 kg/yr P: 8.54 kg/yr Q: 0.00 ac-ft/yr

N=Nitrogen, P=Phosphorus, ART=Detention Residence Time, TD = Retention Treatment Depth

Catchment 3 Wet Detention
Upstream Nodes Node: 1 Node: 2 Node: 3Input Load In N: 153.87 kg/yr P: 32.15 kg/yr Q: 89.39 ac-ft/yr→Treatment Treatment N: 30.61 % P: 56.08 % ART: 10.21 days→Output Mass Discharged N: 106.77 kg/yr P: 14.12 kg/yr Q: 89.39 ac-ft/yr
↓
Mass Reduction Mass Reduction N: 47.11 kg/yr P: 18.03 kg/yr Q: 0.00 ac-ft/yr

N=Nitrogen, P=Phosphorus, ART=Detention Residence Time, TD = Retention Treatment Depth

Routing Method: Strand Based (Detention in Series)

Catchments treated as a system in routing