Each routing calculated with v1's engine and its own method. N is nitrogen, P phosphorus. ★ marks the lowest load to the outlet. "Meets" uses v1's rule: the removal provided against the greater of the type of analysis's percentage and the post = pre removal, where the type uses it. The life-cycle cost adds up the costs entered on the Cost tabs of the treatments each routing uses.
| Routing | Method | N to outlet (kg/yr) | N removed / needed (%) | P to outlet (kg/yr) | P removed / needed (%) | Meets | Runoff out (ac-ft/yr) |
|---|---|---|---|---|---|---|---|
| Routing 1 | Strand (v1's) | 101.94 | 50.79 / 70.4 | 16.12 | 68.41 / 89.8 | No: N short (50.8 of 70.4 %); P short (68.4 of 89.8 %) | 0.00 |
| Routing 2 | Strand (v1's) | 70.07 ★ | 66.17 / 70.4 | 9.41 ★ | 81.56 / 89.8 | No: N short (66.2 of 70.4 %); P short (81.6 of 89.8 %) | 0.00 |
No treatment these routings use has costs yet. Enter them on each treatment's Cost tab to compare the routings' life-cycle cost.
| Catchment | Drains to | Treatment used | Left out |
|---|
No routing meets the required removal yet. Try a larger treatment, another treatment, or treatments in series, in a copy of a routing.