| Permanent Pool Volume | 3.00 ac-ft |
| Permanent Pool Volume for 31 days residence | 0.85 ac-ft |
| Average Residence Time | 109.50 days |
| Has Littoral Zone | Yes |
| Wetland Efficiency Credit | 0.00 % |
Littoral zone: the pond has one, so a credit of 10.00 percentage points is added to the N and P removal from the wet pond equations (Appendix O, Table 1: "Maximum 10% removal with a minimum littoral zone area"; the equations are taken as a pond without one).
| Watershed Area | 4.00 acres |
| Contributing Area to BMP | 4.00 ac |
| Watershed Non-DCIA Curve Number (0-100) | 80 |
| Watershed DCIA Percent | 70.00 % |
| Rainfall Zone | Florida Zone 2 |
| Rainfall | 50.00 in |
| Provided Nitrogen Treatment Efficiency | 52.1 % |
| Provided Phosphorus Treatment Efficiency | 84.7 % |
Runoff input is only from this catchment, no routing is performed here
| N | 29.59 kg/yr |
| P | 4.25 kg/yr |
| Q | 10.00 ac-ft/yr |
| N | 52 % |
| P | 85 % |
| N | 14.18 kg/yr |
| P | 0.65 kg/yr |
| Q | 10.00 ac-ft/yr |
| N | 15.41 kg/yr |
| P | 3.61 kg/yr |
| Q | 0.00 ac-ft/yr |
The following calculations are based on the mean annual stormwater mass
remaining in the wet detention pond. The equations are from Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49),
and valid for anoxic depths from 0.8 to 29.5 feet.
WET DETENTION AS A FIRST BMP: Town center
| Parameter | Value |
|---|---|
| Overall Provided Phosphorus Treatment Efficiency (%) | 74.749 |
| Mean Annual Pond TP Concentration (ug/l) | 87.114 |
| Mean chlorophyll-a concentration (mg/m^3) | 44.359 |
| Mean Secchi Disk Depth (m) | 0.748 |
| Anoxic Pool Depth (ft) | 9.177 |
Note: If anoxic depth < pond depth, recalculate permanent pool volume using the anoxic
depth and re-enter the permanent pool volume.
The equations behind the values above, and the values they are worked with (v1's Equations page).
Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365
N removal (%) = 43.75 x rt / (4.38 + rt)
P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2
Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)
Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100
P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100
Residence Time is capped at 200 days unless ART > 200 is allowed.
The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).
N and P removal cannot exceed 100%.
| Variable | Current value |
|---|---|
| Wetland Efficiency Credit | 0.00 % |
| Permanent Pool Volume | 3.00 ac-ft |
| Annual Runoff Volume | 10.00 ac-ft |
| Treatment Rate | (no media mix) |
| N removal | 52.1 % |
| P removal | 84.7 % |