Routing 1

Routing: two catchments joining at a pond — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading17.45 kg/yr
Total Catchment Nitrogen Loading62.95 kg/yr
Provided Nitrogen Treatment Efficiency72.28 %

Phosphorus

Total Outlet Phosphorus Loading0.95 kg/yr
Total Catchment Phosphorus Loading10.42 kg/yr
Provided Phosphorus Treatment Efficiency90.90 %

Runoff and area

Pre-development runoff volume2.43 ac-ft/yr
Post-development runoff volume leaving the site12.96 ac-ft/yr
Pre-Condition Catchment Area18.00 ac
Post Condition Catchment Area18.00 ac

Requirement

Type of analysisAll sites non-exempted
Nitrogen Removal Performance Specified (by the type of analysis)55.00 %
Phosphorus Removal Performance Specified (by the type of analysis)80.00 %
Nitrogen removal for post = pre85.6 %
Phosphorus removal for post = pre82.9 %
Nitrogen removal to meet (the greater)85.6 %
Phosphorus removal to meet (the greater)82.9 %

Meets the required removal? Nitrogen: no (72.28 % provided, 85.6 % needed). Phosphorus: yes (90.90 % provided, 82.9 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
North subdivisionTown centerRetention
South subdivisionTown centerRetention
Town centerOutletWet Detention