Compare routings

Retention basins routed in series
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Each routing calculated with v1's engine and its own method. N is nitrogen, P phosphorus. ★ marks the lowest load to the outlet. "Meets" uses v1's rule: the removal provided against the greater of the type of analysis's percentage and the post = pre removal, where the type uses it. The life-cycle cost adds up the costs entered on the Cost tabs of the treatments each routing uses.

Routings

RoutingMethodN to outlet (kg/yr)N removed / needed (%)P to outlet (kg/yr)P removed / needed (%)MeetsRunoff out (ac-ft/yr)
Routing 1Strand (v1's)80.4861.15 / 70.419.8361.14 / 89.8No: N short (61.1 of 70.4 %); P short (61.1 of 89.8 %)0.00
Routing 2Strand (v1's)51.0075.38 / 70.412.6275.26 / 89.8No: P short (75.3 of 89.8 %)0.00
Routing 3Strand (v1's)29.41 ★85.80 / 70.47.24 ★85.80 / 89.8No: P short (85.8 of 89.8 %)0.00

No treatment these routings use has costs yet. Enter them on each treatment's Cost tab to compare the routings' life-cycle cost.

What Routing 2 changes from Routing 1 (and retention in series: Efficiencies in series)

CatchmentDrains toTreatment usedLeft out

What Routing 3 changes from Routing 1 (and retention in series: Treatment Depths added)

CatchmentDrains toTreatment usedLeft out

No routing meets the required removal yet. Try a larger treatment, another treatment, or treatments in series, in a copy of a routing.