Routing 1
Retention basins routed in series — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 80.48 kg/yr |
| Total Catchment Nitrogen Loading | 207.14 kg/yr |
| Provided Nitrogen Treatment Efficiency | 61.15 % |
Phosphorus
| Total Outlet Phosphorus Loading | 19.83 kg/yr |
| Total Catchment Phosphorus Loading | 51.03 kg/yr |
| Provided Phosphorus Treatment Efficiency | 61.14 % |
Runoff and area
| Pre-development runoff volume | 23.54 ac-ft/yr |
| Post-development runoff volume leaving the site | 0.00 ac-ft/yr |
| Pre-Condition Catchment Area | 83.29 ac |
| Post Condition Catchment Area | 83.29 ac |
Requirement
| Type of analysis | All sites non-exempted |
| Nitrogen Removal Performance Specified (by the type of analysis) | 55.00 % |
| Phosphorus Removal Performance Specified (by the type of analysis) | 80.00 % |
| Nitrogen removal for post = pre | 70.4 % |
| Phosphorus removal for post = pre | 89.8 % |
| Nitrogen removal to meet (the greater) | 70.4 % |
| Phosphorus removal to meet (the greater) | 89.8 % |
Meets the required removal? Nitrogen: no (61.15 % provided, 70.4 % needed). Phosphorus: no (61.14 % provided, 89.8 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Upstream subdivision | Middle subdivision | Retention | |
| Middle subdivision | Downstream commercial | Retention | |
| Downstream commercial | Outlet | Retention | |