Routing 2

Retention basins routed in series — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading51.00 kg/yr
Total Catchment Nitrogen Loading207.14 kg/yr
Provided Nitrogen Treatment Efficiency75.38 %

Phosphorus

Total Outlet Phosphorus Loading12.62 kg/yr
Total Catchment Phosphorus Loading51.03 kg/yr
Provided Phosphorus Treatment Efficiency75.26 %

Runoff and area

Pre-development runoff volume23.54 ac-ft/yr
Post-development runoff volume leaving the site0.00 ac-ft/yr
Pre-Condition Catchment Area83.29 ac
Post Condition Catchment Area83.29 ac

Requirement

Type of analysisAll sites non-exempted
Nitrogen Removal Performance Specified (by the type of analysis)55.00 %
Phosphorus Removal Performance Specified (by the type of analysis)80.00 %
Nitrogen removal for post = pre70.4 %
Phosphorus removal for post = pre89.8 %
Nitrogen removal to meet (the greater)70.4 %
Phosphorus removal to meet (the greater)89.8 %

Meets the required removal? Nitrogen: yes (75.38 % provided, 70.4 % needed). Phosphorus: no (75.26 % provided, 89.8 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
Upstream subdivisionMiddle subdivisionRetention
Middle subdivisionDownstream commercialRetention
Downstream commercialOutletRetention