BMPs in Series

Ex # 5 perm pave to det one catch — BMPs in Series on Highway Section 206 (stand-alone: this catchment's runoff only)
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Multiple BMP in Series

Watershed Characteristics

Watershed Area5.00 acres
Contributing Area to BMP5.00 ac
Watershed Non-DCIA Curve Number (0-100)80
Watershed DCIA Percent60.00 %
Rainfall ZoneFlorida Zone 5
Rainfall61.00 in

BMP in Series Number: 1 (BMP Type: Permeable Pavement)

Pavement Surface Area2.04 acres
Treatment Depth1.42 in

BMP in Series Number: 2 (BMP Type: Wet Detention)

Permanent Pool Volume3.81 ac-ft
Permanent Pool Volume for 31 days residence1.18 ac-ft
Average Residence Time100.00 days
Has Littoral ZoneYes
Wetland Efficiency Credit0.00 %
Nitrogen Treatment Efficiency (Series Contribution)9.52 %
Phosphorus Treatment Efficiency (Series Contribution)17.12 %
Average Effective Residence Time477.40 days

Equivalent Treatment Depth and Efficiency (Retention to Wet Detention)

When all upstream BMPs consist of Retention BMPs, the sum of the treatment depths are used to calculate efficiency. These are titled Equivalent Treatment Depth and Equivalent Treatment Efficiency.

The wet detention is then applied to what this system passes on, which gives the treatment efficiency of the Multiple BMP.

ParameterValue
Equivalent Treatment Depth (in)1.420
Equivalent Treatment Efficiency (%)79.053
Multiple BMP Provided N Treatment Efficiency (%)89
Multiple BMP Provided P Treatment Efficiency (%)96

Surface Water Discharge

Provided Nitrogen Treatment Efficiency88.6 %
Provided Phosphorus Treatment Efficiency96.2 %

Load for Multiple BMP in Series

Load N: 21.43 kg/yr P: 2.97 kg/yr Q: 13.90 ac-ft/yr→Treatment N: 89 % P: 96 % Q: 79 %→Surface Discharge N: 2.45 kg/yr P: 0.11 kg/yr Q: 2.91 ac-ft/yr
↓
Mass Reduction N: 18.98 kg/yr P: 2.85 kg/yr Q: 10.99 ac-ft/yr

Anoxic depth

The following calculations are based on the mean annual stormwater mass

remaining in the wet detention pond. The equations are from Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49),

and valid for anoxic depths from 0.8 to 29.5 feet.

WET DETENTION AS A FIRST BMP: Highway Section 206

ParameterValue
Overall Provided Phosphorus Treatment Efficiency (%)96.173
Mean Annual Pond TP Concentration (ug/l)6.621
Mean chlorophyll-a concentration (mg/m^3)2.903
Mean Secchi Disk Depth (m)2.802
Anoxic Pool Depth (ft)27.996

Note: If anoxic depth < pond depth, recalculate permanent pool volume using the anoxic

depth and re-enter the permanent pool volume.

Equations

The equations behind the values above, and the values they are worked with (v1's Equations page).

Multiple BMP in Series — Equations

System case

Case type: Retention to Wet Detention. Calculation used: Retention to Wet Detention (combined retention system, routed).

Retention [BMP 1 (Permeable Pavement)] → Routed wet detention [BMP 2 (Wet Detention)]

SegmentBMPsHow it is calculated
RetentionBMP 1 (Permeable Pavement)Treatment depths summed (Equivalent Treatment Depth); removal e from the retention lookup tables
Routed wet detentionBMP 2 (Wet Detention)Effective Residence Time from the volume the retention passes on; combined as e + (100 - e)(D/100 - a/100 x e/100), a = 10 (N), 20 (P)

Equations

Equivalent Treatment Depth (in) = sum of the Treatment Depths of the retention BMPs

Equivalent Treatment Efficiency e (%) = retention lookup (Equivalent Treatment Depth, non-DCIA CN, DCIA %, rainfall zone)

Volume to pond (ac-ft/yr) = Runoff x (100 - e) / 100

Effective Residence Time (days) = Permanent Pool Volume (ac-ft) / Volume to pond (ac-ft/yr) x 365

D = the pond's removal at the Effective Residence Time

Pond series contribution (%) = (100 - e) x (D / 100 - a / 100 x e / 100), a = 10 for N, 20 for P (not below 0)

Removal (%) = e + pond series contribution

Notes

The Multiple BMP detects its scenario from the BMPs in the series and uses the calculation named above.

The steps table lists every calculation in the order it was made, with the values used.

Each BMP's section shows its own equations and its values as they stand after the series calculation.

When all upstream BMPs consist of Retention BMPs, the sum of the treatment depths are used to calculate efficiency. These are titled Equivalent Treatment Depth and Equivalent Treatment Efficiency.

The wet detention is then applied to what this system passes on, which gives the treatment efficiency of the Multiple BMP.

Values

VariableCurrent value
ScenarioRetention to Wet Detention
Calculation usedRetention to Wet Detention (combined retention system, routed)
Runoff into the series13.903 ac-ft/yr
N load into the series21.428 kg/yr
P load into the series2.966 kg/yr
Equivalent Treatment Depth1.42 in
Equivalent Treatment Efficiency (e)79.053 %
Hydraulic Capture79.1 %
N removal (Multiple BMP)88.6 %
P removal (Multiple BMP)96.2 %
N load out (surface discharge)2.449 kg/yr
P load out (surface discharge)0.114 kg/yr

Calculation steps (values as used)

#StepCalculation (values used)Result
1Inflow to the seriescatchment runoff and loadsQ 13.903 ac-ft/yr, N 21.428 kg/yr, P 2.966 kg/yr
2Equivalent Treatment DepthBMP 1 (Permeable Pavement) 1.42 in1.42 in
3Equivalent Treatment Efficiency (e)retention lookup at 1.42 in, non-DCIA CN 80, DCIA 60 %, Florida Zone 579.05 %
4Volume passed to the pond13.903 x (100 - 79.053) / 1002.912 ac-ft/yr
5Effective Residence Time3.809 ac-ft / 2.912 ac-ft/yr x 365477.4 days
6Pond removal D at that residence timewet detention N and P equations, + 10 points (littoral zone credit)N 53.35 %, P 97.54 %
7Pond series contributionN: (100 - 79.053) x (53.352/100 - 10/100 x 79.053/100); P: (100 - 79.053) x (97.539/100 - 20/100 x 79.053/100) (not below 0)N 9.52 %, P 17.12 %
8Removal through the pond (e + pond contribution)N: 79.053 + 9.52; P: 79.053 + 17.119N 88.57 %, P 96.17 %
9Loads out of the retention systemload in x (100 - e) / 100N 4.488 kg/yr, P 0.621 kg/yr
10Loads out of the Wet Detentionits load in, less its series contribution expressed on the flow reaching itN 2.449 kg/yr, P 0.114 kg/yr

BMP 1: Permeable Pavement

Part of the combined retention system: its Treatment Depth is added into the Equivalent Treatment Depth. Its own N and P removal below is not applied separately.

Equations

Storage (ac-ft) = Surface Area (ac) x Sum over layers [Layer Thickness (in) x Sustainable Void (%) / 100] x Layer Scale Factor / 12

Treatment Depth (in) = Storage / Watershed Area (ac) x 12

Notes

Sizing scales every pavement layer by the same factor: 1.0 is the layers as entered, 1.5 makes each layer half again as thick. Apply multiplies each layer thickness by the factor; Cancel leaves the layers as they were.

With no layers entered, sizing starts from 12 in of User Defined(20).

Hydraulic capture efficiency is read from the retention efficiency lookup tables for the Treatment Depth.

The lookup also depends on the watershed's non-DCIA curve number, DCIA percent and rainfall zone.

N and P removal are equal to the hydraulic capture efficiency.

A recovery-time adjustment for Time to Recover Design Volume is added to the capture efficiency and to N and P removal (see Recovery-Time Adjustment).

Values

VariableCurrent value
Contributing Area2.960 ac
Watershed Area5.000 ac
Non-DCIA Curve Number80
DCIA Percent60 %
Rainfall ZoneFlorida Zone 5
Treatment Depth1.420 in
Hydraulic Capture79.1 %
Treatment Rate(no media mix)
N removal79.1 %
P removal79.1 %

BMP 2: Wet Detention

Receives what the retention system passes on; its residence time is re-derived from that volume (see the steps above).

Equations

Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365

N removal (%) = 43.75 x rt / (4.38 + rt)

P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2

Littoral zone: N removal = N removal + Littoral Zone Credit, P removal = P removal + Littoral Zone Credit (credit 0 to 10 %; none without one)

Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100

P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100

Notes

Residence Time is capped at 200 days unless ART > 200 is allowed.

The littoral zone credit is added before the wetland credit (BMPFast 2: the equations are a pond without a littoral zone).

N and P removal cannot exceed 100%.

Values

VariableCurrent value
Wetland Efficiency Credit0.00 %
Permanent Pool Volume3.81 ac-ft
Annual Runoff Volume13.90 ac-ft
Treatment Rate(no media mix)
N removal53.4 %
P removal97.5 %
Effective Residence Time (routed)477.4 days
Pond N removal at that residence time43.352 %
Pond P removal at that residence time96.173 %
N series contribution9.52 %
P series contribution17.119 %