Routing 1
Ex # 5 perm pave to det one catch — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 2.45 kg/yr |
| Total Catchment Nitrogen Loading | 21.43 kg/yr |
| Provided Nitrogen Treatment Efficiency | 88.57 % |
Phosphorus
| Total Outlet Phosphorus Loading | 0.11 kg/yr |
| Total Catchment Phosphorus Loading | 2.97 kg/yr |
| Provided Phosphorus Treatment Efficiency | 96.17 % |
Runoff and area
| Pre-development runoff volume | 4.79 ac-ft/yr |
| Post-development runoff volume leaving the site | 2.91 ac-ft/yr |
| Pre-Condition Catchment Area | 6.00 ac |
| Post Condition Catchment Area | 5.00 ac |
Requirement
| Type of analysis | Specified Removal Efficiency |
| Nitrogen Removal Performance Specified (by the type of analysis) | 55.00 % |
| Phosphorus Removal Performance Specified (by the type of analysis) | 75.00 % |
| Nitrogen removal to meet (the greater) | 55.0 % |
| Phosphorus removal to meet (the greater) | 75.0 % |
Meets the required removal? Nitrogen: yes (88.57 % provided, 55.0 % needed). Phosphorus: yes (96.17 % provided, 75.0 % needed). The removal needed is the type of analysis's percentage.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Highway Section 206 | Outlet | BMPs in Series | |