Routing 1

Ex # 5 perm pave to det one catch — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading2.45 kg/yr
Total Catchment Nitrogen Loading21.43 kg/yr
Provided Nitrogen Treatment Efficiency88.57 %

Phosphorus

Total Outlet Phosphorus Loading0.11 kg/yr
Total Catchment Phosphorus Loading2.97 kg/yr
Provided Phosphorus Treatment Efficiency96.17 %

Runoff and area

Pre-development runoff volume4.79 ac-ft/yr
Post-development runoff volume leaving the site2.91 ac-ft/yr
Pre-Condition Catchment Area6.00 ac
Post Condition Catchment Area5.00 ac

Requirement

Type of analysisSpecified Removal Efficiency
Nitrogen Removal Performance Specified (by the type of analysis)55.00 %
Phosphorus Removal Performance Specified (by the type of analysis)75.00 %
Nitrogen removal to meet (the greater)55.0 %
Phosphorus removal to meet (the greater)75.0 %

Meets the required removal? Nitrogen: yes (88.57 % provided, 55.0 % needed). Phosphorus: yes (96.17 % provided, 75.0 % needed). The removal needed is the type of analysis's percentage.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
Highway Section 206OutletBMPs in Series