Routing 1
Stormwater harvesting: subdivision irrigating common areas — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00
Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.
Nitrogen
| Total Outlet Nitrogen Loading | 9.53 kg/yr |
| Total Catchment Nitrogen Loading | 95.30 kg/yr |
| Provided Nitrogen Treatment Efficiency | 90.00 % |
Phosphorus
| Total Outlet Phosphorus Loading | 1.76 kg/yr |
| Total Catchment Phosphorus Loading | 17.61 kg/yr |
| Provided Phosphorus Treatment Efficiency | 90.00 % |
Runoff and area
| Pre-development runoff volume | 5.40 ac-ft/yr |
| Post-development runoff volume leaving the site | 4.37 ac-ft/yr |
| Pre-Condition Catchment Area | 40.00 ac |
| Post Condition Catchment Area | 40.00 ac |
Requirement
| Type of analysis | Net Improvement |
| Nitrogen removal for post = pre | 78.8 % |
| Phosphorus removal for post = pre | 77.6 % |
| Nitrogen removal to meet (the greater) | 78.8 % |
| Phosphorus removal to meet (the greater) | 77.6 % |
Meets the required removal? Nitrogen: yes (90.00 % provided, 78.8 % needed). Phosphorus: yes (90.00 % provided, 77.6 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.
How each catchment is routed
| Catchment | Drains to | Treatment used | Left out |
| Subdivision | Outlet | Stormwater Harvesting | |