Routing 1 — Summary Report

Swale with blocks: two-lane road
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Redevelopment + OFW

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1Road and shouldersSwaleRouted to Outlet

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition2.750.652.85
System Post-Condition (with BMPs)2.751.968.57
Post-Condition (no BMP)2.754.8721.25

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

Summary Loading:

Specified (for Redevelopment + OFW)TN = 60.00%;TP = 90.00%
ProvidedTN = 59.67%;TP = 59.67%

% Specified Removal:

Is specified removal for total nitrogen removal met? Yes

Is specified removal for total phosphorus removal met? No

Results are compared against the analysis type targets. Percentages are shown to two decimals.

No Pre/Post Analysis

Analysis Type: Redevelopment + OFW

There are no pre/post targets for this analysis type.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load0.88 kg/yr
Total N post load7.51 kg/yr
Percent N load reduction59.67 %
Provided N discharge load3.03 kg/yr (6.67 lb/yr)
Provided N load removed (surface)4.48 kg/yr (9.88 lb/yr)

Phosphorus (P)
Total P pre load0.035 kg/yr
Total P post load1.039 kg/yr
Percent P load reduction59.67 %
Provided P discharge load0.419 kg/yr (0.924 lb/yr)
Provided P load removed (surface)0.620 kg/yr (1.367 lb/yr)

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.