Routing 1

swale example 1 — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading3.38 kg/yr
Total Catchment Nitrogen Loading5.53 kg/yr
Provided Nitrogen Treatment Efficiency38.85 %

Phosphorus

Total Outlet Phosphorus Loading0.47 kg/yr
Total Catchment Phosphorus Loading0.77 kg/yr
Provided Phosphorus Treatment Efficiency38.85 %

Runoff and area

Pre-development runoff volume0.97 ac-ft/yr
Post-development runoff volume leaving the site2.19 ac-ft/yr
Pre-Condition Catchment Area1.20 ac
Post Condition Catchment Area1.20 ac

Requirement

Type of analysisNet Improvement
Nitrogen removal for post = pre34.3 %
Phosphorus removal for post = pre7.1 %
Nitrogen removal to meet (the greater)34.3 %
Phosphorus removal to meet (the greater)7.1 %

Meets the required removal? Nitrogen: yes (38.85 % provided, 34.3 % needed). Phosphorus: yes (38.85 % provided, 7.1 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
roadside OutletSwale