Routing 1 — Summary Report

swale example 1
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Summary Treatment Report: Net Improvement

Catchments and Associated BMP Types

IDCatchment NameCatchment BMPRouting Destination
1roadsideSwaleRouted to Outlet

Volume of Runoff Summary

ScenarioCatchment Area (acres)Runoff Volume (ac-ft/yr)Runoff Volume (in/year)
Pre-Condition1.200.979.72
System Post-Condition (with BMPs)1.202.1921.94
Post-Condition (no BMP)1.203.5935.88

Runoff volumes are shown in acre-feet per year and converted to depth (inches/year) by dividing by area and multiplying by 12.

The catchment area is the same in both post rows: BMPs do not change the area, only how much runoff leaves it. Post-Condition (no BMP) is all the runoff the post-development catchments produce; System Post-Condition (with BMPs) is the runoff that leaves the system at the outlet. BMPs that keep water out of the surface discharge (retention, exfiltration, harvesting and the like) make the with-BMP volume smaller; BMPs that discharge to surface water (wet detention, surface discharge filtration) remove nutrient load but not volume, so the two volumes can be equal.

Summary of Removals

No Specified % Removals

Analysis Type: Net Improvement

There are no specified % removals defined for this analysis type.

Pre vs. Post Removals

Pre/PostTN = 34.33%;TP = 7.14%
ProvidedTN = 38.85%;TP = 38.85%

% Removal:

Is removal (pre<=post) for total nitrogen removal met? Yes

Is removal (pre<=post) for total phosphorus removal met? Yes

Pre/Post comparisons use analysis-type settings to derive required reductions. Values shown to two decimals unless noted.

Nitrogen & Phosphorus Loading

Surface water and groundwater loading summary

Nitrogen (N)
Total N pre load3.63 kg/yr
Total N post load5.53 kg/yr
Target N load reduction34.33 %
Target N discharge load3.63 kg/yr
Percent N load reduction38.85 %
Provided N discharge load3.38 kg/yr (7.46 lb/yr)
Provided N load removed (surface)2.15 kg/yr (4.74 lb/yr)
Average Annual Recharge0.454 MG/yr
Provided N recharge load0.537 kg/yr (1.184 lb/yr)
Provided N recharge concentration0.312 mg/l

Phosphorus (P)
Total P pre load0.711 kg/yr
Total P post load0.765 kg/yr
Target P load reduction7.14 %
Target P discharge load0.711 kg/yr
Percent P load reduction38.85 %
Provided P discharge load0.468 kg/yr (1.032 lb/yr)
Provided P load removed (surface)0.297 kg/yr (0.656 lb/yr)
Average Annual Recharge0.454 MG/yr
Provided P recharge load0.0149 kg/yr (0.0328 lb/yr)
Provided P recharge concentration0.009 mg/l

Values are project totals. Surface units = kg/yr; groundwater recharge in MG/yr and concentrations in mg/L. Values formatted to appropriate precision.