Routing 1

Tree wells: detention with underdrain — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading5.60 kg/yr
Total Catchment Nitrogen Loading9.67 kg/yr
Provided Nitrogen Treatment Efficiency42.07 %

Phosphorus

Total Outlet Phosphorus Loading0.51 kg/yr
Total Catchment Phosphorus Loading1.39 kg/yr
Provided Phosphorus Treatment Efficiency63.10 %

Runoff and area

Pre-development runoff volume0.31 ac-ft/yr
Post-development runoff volume leaving the site0.98 ac-ft/yr
Pre-Condition Catchment Area1.00 ac
Post Condition Catchment Area1.00 ac

Requirement

Type of analysisSpecified Removal Efficiency
Nitrogen Removal Performance Specified (by the type of analysis)50.00 %
Phosphorus Removal Performance Specified (by the type of analysis)50.00 %
Nitrogen removal to meet (the greater)50.0 %
Phosphorus removal to meet (the greater)50.0 %

Meets the required removal? Nitrogen: no (42.07 % provided, 50.0 % needed). Phosphorus: yes (63.10 % provided, 50.0 % needed). The removal needed is the type of analysis's percentage.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
PlazaOutletTree Well