User Defined BMP

User defined BMP: alum treatment — User Defined BMP on Commercial site (stand-alone: this catchment's runoff only)
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

User Defined BMP Input Variables

User Defined BMPAlum Treating
Contributing Area to BMP20.00 ac
Calculated Nitrogen Treatment Efficiency (as entered)50.00 %
Calculated Phosphorus Treatment Efficiency (as entered)90.00 %
Hydraulic Capture, entered (%; 0 = passes all its flow forward)90.0

Watershed Characteristics

Watershed Area20.00 acres
Contributing Area to BMP20.00 ac
Watershed Non-DCIA Curve Number (0-100)80
Watershed DCIA Percent70.00 %
Rainfall ZoneFlorida Zone 3
Rainfall54.00 in

Surface Water Discharge

Provided Nitrogen Treatment Efficiency50.0 %
Provided Phosphorus Treatment Efficiency90.0 %

Groundwater Discharge (Stand-Alone)

Average Annual Recharge0.00 MG/yr
TN Mass Load0.00 kg/yr
TN Concentration0.00 mg/L
TP Mass Load0.00 kg/yr
TP Concentration0.00 mg/L

Surface Discharge Load Diagram for User Defined BMP (stand-alone)

Runoff input is only from this catchment, no routing is performed here

Load

N158.73 kg/yr
P22.82 kg/yr
Q53.64 ac-ft/yr

Treatment

N50 %
P90 %

Surface Discharge

N79.37 kg/yr
P2.28 kg/yr
Q5.36 ac-ft/yr

Mass Reduction

N79.37 kg/yr
P20.54 kg/yr
Q48.28 ac-ft/yr

Equations

The equations behind the values above, and the values they are worked with (v1's Equations page).

User Defined BMP — Equations

Equations

N removal (%) = the Nitrogen removal efficiency entered

P removal (%) = the Phosphorus removal efficiency entered

Notes

A user-defined BMP has no sizing equations; its removal efficiencies are entered directly.

They are applied to the annual load reaching the BMP in the routing (treatment train) calculation.

Values

VariableCurrent value
Hydraulic Capture90.0 %
Treatment Rate(no media mix)
N removal50.0 %
P removal90.0 %