Routing 1

User defined BMP: alum treatment — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading79.37 kg/yr
Total Catchment Nitrogen Loading158.73 kg/yr
Provided Nitrogen Treatment Efficiency50.00 %

Phosphorus

Total Outlet Phosphorus Loading2.28 kg/yr
Total Catchment Phosphorus Loading22.82 kg/yr
Provided Phosphorus Treatment Efficiency90.00 %

Runoff and area

Pre-development runoff volume7.02 ac-ft/yr
Post-development runoff volume leaving the site5.36 ac-ft/yr
Pre-Condition Catchment Area20.00 ac
Post Condition Catchment Area20.00 ac

Requirement

Type of analysisSpecified Removal Efficiency
Nitrogen Removal Performance Specified (by the type of analysis)60.00 %
Phosphorus Removal Performance Specified (by the type of analysis)85.00 %
Nitrogen removal to meet (the greater)60.0 %
Phosphorus removal to meet (the greater)85.0 %

Meets the required removal? Nitrogen: no (50.00 % provided, 60.0 % needed). Phosphorus: yes (90.00 % provided, 85.0 % needed). The removal needed is the type of analysis's percentage.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
Commercial siteOutletUser Defined BMP