How this treatment's values are worked out: the equations, then the values they are worked with (v1's Equations button). A change on the Entry or Sizing tab shows here at once.
N removal (%) = the Nitrogen removal efficiency entered
P removal (%) = the Phosphorus removal efficiency entered
A user-defined BMP has no sizing equations; its removal efficiencies are entered directly.
They are applied to the annual load reaching the BMP in the routing (treatment train) calculation.
| Variable | Current value |
|---|---|
| Hydraulic Capture | 90.0 % |
| Treatment Rate | (no media mix) |
| N removal | 50.0 % |
| P removal | 90.0 % |