Routing 1

Wet detention: commercial site, impaired water — Catchment Routing results
Made by BMPFast 2 on Tuesday, 20 October 2026 16:00

Calculated with v1's engine, by Strand routing (v1's routing; use this for permits), so an opened v1 project gives the numbers v1 gives. This is the summary; v1's reports for this routing (Summary, Complete, Flow Balance, Full Routing Diagram, compliance, catchments and their treatments) are in the Report list above.

Nitrogen

Total Outlet Nitrogen Loading22.78 kg/yr
Total Catchment Nitrogen Loading39.68 kg/yr
Provided Nitrogen Treatment Efficiency42.61 %

Phosphorus

Total Outlet Phosphorus Loading1.25 kg/yr
Total Catchment Phosphorus Loading5.70 kg/yr
Provided Phosphorus Treatment Efficiency78.13 %

Runoff and area

Pre-development runoff volume1.75 ac-ft/yr
Post-development runoff volume leaving the site13.41 ac-ft/yr
Pre-Condition Catchment Area5.00 ac
Post Condition Catchment Area5.00 ac

Requirement

Type of analysisImpaired Water
Nitrogen Removal Performance Specified (by the type of analysis)80.00 %
Phosphorus Removal Performance Specified (by the type of analysis)80.00 %
Nitrogen removal for post = pre94.1 %
Phosphorus removal for post = pre98.4 %
Nitrogen removal to meet (the greater)94.1 %
Phosphorus removal to meet (the greater)98.4 %

Meets the required removal? Nitrogen: no (42.61 % provided, 94.1 % needed). Phosphorus: no (78.13 % provided, 98.4 % needed). The removal needed is the greater of the type of analysis's percentage and the post = pre removal, as in v1's reports.

How each catchment is routed

CatchmentDrains toTreatment usedLeft out
Commercial siteOutletWet Detention