Example Problem 3: TN at the outlet for depths of 0.25 to 2 in.

1The problem

The BMPFast sample project Example Problem 3. How much does the outlet nitrogen load fall as the retention treatment depth grows from 0.25 to 2 in?

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP75 % / 75 %BMPFast sample project
Catchment 1: catchment 1 (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilyBMPFast sample project
Area, pre / post11 / 11 acBMPFast sample project
Non-DCIA curve number, pre / post50 / 65BMPFast sample project
DCIA, pre / post0 / 25 %BMPFast sample project
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)

Find: how Total Outlet Nitrogen Loading changes as Treatment Depth varies.

2Steps in BMPFast 2

  1. Start BMPFast 2, choose File ▸ Open and open discovery-retention-depth.bmpf (under Files below). The tree on the left opens on the project, General Site Information: Florida Zone 4, 50.0 in of rainfall, type of analysis Specified Removal Efficiency.

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Under Catchment Routings select Routing 1 and open its Plots tab: the Discovery Plot. It opens on Provided Nitrogen Treatment Efficiency (%) in What to plot (Y) and Treatment Depth (in) — Retention (Catchment 1 (catchment 1)) in Vary (X). The lists hold the routing’s results and the design values of its catchments and of the treatments it uses.

    The routing’s Plots tab as it opens: the Discovery Plot.
    The routing’s Plots tab as it opens: the Discovery Plot.
  3. In What to plot (Y) choose Total Outlet Nitrogen Loading (kg/yr). In Vary (X) choose Treatment Depth (in) — Retention (Catchment 1 (catchment 1)): Its value now shows 0.55 in, and From and To are filled with a range around it (0.28 to 0.83). Type 0.25 in From, 2 in To and 8 in Steps (pressing Enter after each), then press Draw the plot. Each of the 8 steps (so 9 points, From and To included) is a full calculation of the routing with only that value changed; the routing itself is not changed.

    The Discovery Plot set up: what to plot, what to vary, the range and the steps.
    The Discovery Plot set up: what to plot, what to vary, the range and the steps.
  4. Scroll down: the plot is under the form. This design: 0.55 in gives 6.15 kg/yr; at From 0.25 gives 11.07, at To 2.00 gives 1.40. The diamond is the design as it stands.

    The plot, under the form.
    The plot, under the form.

3Results

Total Outlet Nitrogen Loading against Treatment Depth, 8 steps from 0.25 to 2:

Treatment Depth (in)Total Outlet Nitrogen Loading (kg/yr), BMPFast 2BMPFast (v1)
0.25011.07311.073
0.4697.1337.133
0.6885.0575.057
0.9063.8453.845
1.1253.0393.039
1.3442.4552.455
1.5622.0182.018
1.7811.6821.682
2.0001.4031.403

Every point is the same as BMPFast (v1)’s, to three decimals. Routing 1: each point is the whole routing calculated with Treatment Depth at that value; everything else as entered. The diamond is the design as it stands.

The routing’s Results report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site6.150 kg/yr6.150 kg/yrsame
Phosphorus leaving the site1.136 kg/yr1.136 kg/yrsame
Site removal, nitrogen75.006 %75.006 %same
Site removal, phosphorus75.006 %75.006 %same
catchment 1: Retention removal, nitrogen75.006 %75.006 %same
catchment 1: Retention removal, phosphorus75.006 %75.006 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

The current design is on the curve. The project’s own value, Treatment Depth (in) = 0.552, gives Total Outlet Nitrogen Loading (kg/yr) = 6.150: the diamond on the plot, and the same as the routing’s Results report. Every other point is the whole routing calculated with only that value changed, so any point can be checked by typing that value on the treatment’s or catchment’s Entry tab and reading the routing’s Results (then Edit ▸ Undo). The curve runs from 11.073 to 1.403 over the range (Discovery Plots Methodology).

5Files

  • discovery-retention-depth.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • discovery-retention-depth.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Retention (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Retention — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.