All programs › BMPFast › BMPFast 2 sample problems
Media mix: residence time under and over 2 hours
SAT media in a detention rain garden.
Help: Media Mix (help page 817) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A detention rain garden in a half-acre parking lot uses SAT media. The media removal depends on whether the water stays in the media more than 2 hours.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Parking lot (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Low-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 0.5 / 0.5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 80 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 0.930 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.190 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Rain garden | detention; void 0.3; 1,200 cf soil; 600 cf above media | Design (illustrative) |
Find: the media reduction and the rain garden removal for a residence time under and over 2 hours.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Media mix: rain garden, residence time; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open
media-mix-residence-time.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Parking lot and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Low-Intensity Commercial; Area (pre) 0.50 ac; Area (post) 0.50 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 80.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.670; Runoff volume (post) 1.396 ac-ft/yr; Nitrogen load (post) 1.601 kg/yr; Phosphorus load (post) 0.327 kg/yr.

The catchment Parking lot: its Entry tab. With Parking lot selected, press Add Treatment and choose Rain Garden. On its Entry tab type the Treatment name Rain Garden, choose System type Detention, type the Sustainable void fraction 0.30, Native soil volume 1,200 ft³ and Water storage above the media 600 ft³, and choose Media mix SAT. Leave Is the media design residence time more than 2 hours? at Yes: the mix gives Media nitrogen reduction 30 % and phosphorus 45 %, and the rain garden removes Nitrogen 30.00 % and Phosphorus 45.00 %.

The treatment Rain Garden: its Entry tab. Now the same rain garden with a residence time under 2 hours. Right-click Rain Garden in the tree and choose Copy treatment (also on the Project menu); on the copy’s Entry tab name it Rain Garden, under 2 hours and answer No to Is the media design residence time more than 2 hours?. The same SAT mix now gives Media nitrogen and phosphorus reduction 25 % and 25 %, and the rain garden removes Nitrogen 25.00 % and Phosphorus 25.00 %. The routing below uses Rain Garden, the one over 2 hours, as v1’s problem does.

The treatment Rain Garden, under 2 hours: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Rain Garden: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Parking lot Outlet Rain Garden A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result (BMPFast 2) | Value | BMPFast (v1) |
|---|---|---|
| Under 2 h: media reduction TN / TP | 25 % / 25 % | v1: 25 % / 25 % |
| Under 2 h (Rain Garden, under 2 hours): removal TN / TP | 25.00 % / 25.00 % | v1: 25.00 % / 25.00 % |
| Over 2 h: media reduction TN / TP | 30 % / 45 % | |
| Over 2 h (Rain Garden): removal TN / TP | 30.00 % / 45.00 % |
The treatment the routing uses is the second; the table below compares its results, and the site’s, with v1’s.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 1.120 kg/yr | 1.120 kg/yr | same |
| Phosphorus leaving the site | 0.180 kg/yr | 0.180 kg/yr | same |
| Site removal, nitrogen | 30.000 % | 30.000 % | same |
| Site removal, phosphorus | 45.000 % | 45.000 % | same |
| Parking lot: Rain Garden removal, nitrogen | 30.000 % | 30.000 % | same |
| Parking lot: Rain Garden removal, phosphorus | 45.000 % | 45.000 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Storage.
| Storage | = native soil volume × void fraction + water above the media |
| = 1,200 × 0.30 + 600 | |
| = 960 cf (program 960). |
Treatment depth.
| Depth | = storage × 12 / area |
| = 0.0220 ac-ft × 12 / 0.50 ac | |
| = 0.529 in (program 0.529). |
Removal. A detention rain garden discharges what it filters, so its removal is the media reduction of SAT: TN 30 %, TP 45 % (program 30.00 / 45.00).
5Files
- media-mix-residence-time.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- media-mix-residence-time.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rain Garden (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rain Garden — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.