Mean annual rainfall: a site near Orlando

Central Florida: Zone 2, 50 in.

1The problem

A 10-acre subdivision near Orlando. Which zone and rainfall go on General Site Information?

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post10 / 10 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)

Find: the zone and mean annual rainfall to enter, and the runoff and loads they give.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree opens on the project (General Site Information). Open its Help tab and scroll down past the help links: the first map is Florida meteorological zones (1 to 5) (the Applicant’s Handbook, Appendix M).

    The project’s Help tab: the meteorological zone map.
    The project’s Help tab: the meteorological zone map.
  2. The zone map, as BMPFast 2 shows it. The site is in Florida Zone 2.

    Florida meteorological zones (1 to 5), the map on the Help tab.
    Florida meteorological zones (1 to 5), the map on the Help tab.
  3. Scroll on to Mean annual rainfall — central, the rainfall isopleths for central Florida in more detail (the whole state’s map is just above it).

    The project’s Help tab: the central rainfall map.
    The project’s Help tab: the central rainfall map.
  4. The central map, as BMPFast 2 shows it. Read the rainfall at the site between the isopleths: about 50 in. Between two lines the engineer of record chooses the value and says so in the permit.

    Mean annual rainfall — central, the map on the Help tab.
    Mean annual rainfall — central, the map on the Help tab.
  5. Open the Entry tab and enter: Project name Mean annual rainfall: Orlando; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis. (To see the finished project instead, choose File ▸ Open and open rainfall-orlando.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  6. Press Add Catchment (left) and select it in the tree. On its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 10.00 ac; Area (post) 10.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %.

    The catchment’s Entry tab.
    The catchment’s Entry tab.
  7. At the bottom of the Entry tab, under Calculated, BMPFast 2 works out the runoff and loads with the zone and rainfall: after development, Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 10.917 ac-ft/yr; Nitrogen load (post) 23.825 kg/yr; Phosphorus load (post) 4.402 kg/yr.

    The bottom of the Entry tab: the runoff and loads for this zone and rainfall.
    The bottom of the Entry tab: the runoff and loads for this zone and rainfall.

3Results

SubdivisionThis site (Orlando)The same catchment near Miami
Meteorological zoneFlorida Zone 2Florida Zone 5
Mean annual rainfall50 in59 in
Annual runoff coefficient (ROC), post0.2620.292
Runoff volume, post (ac-ft/yr)10.91714.357
Nitrogen load, post (kg/yr)23.82531.332
Phosphorus load, post (kg/yr)4.4025.788
Runoff volume, pre (ac-ft/yr)1.3502.960

The last column is the same project with the other site’s zone and rainfall, calculated by BMPFast 2.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site23.825 kg/yr23.825 kg/yrsame
Phosphorus leaving the site4.402 kg/yr4.402 kg/yrsame
Site removal, nitrogen0.000 %0.000 %same
Site removal, phosphorus0.000 %0.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff.

0.262 × 50 in / 12 × 10 ac = 10.917 ac-ft/yr (BMPFast 2 10.917). The load is the runoff × the EMC × 1.233 (kg per mg/L per ac-ft):

Zone and rainfall. The runoff is in direct proportion to the rainfall, for the same ROC. The zone changes the ROC itself (Appendix N tables: 0.262 in Florida Zone 2, 0.292 in Florida Zone 5) and the BMP efficiency tables (Appendix O), so both must be the site’s (help page 815, help page 823).

5Files

  • rainfall-orlando.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • rainfall-orlando.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.